My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/11/21 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/11/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 8:29:21 AM
Creation date
3/20/2017 8:56:39 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/21/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />$ 423,736.13 <br />A <br />4 <br />Final Acceptance and <br />X Consent <br />COUNCIL BILL # <br />$28,022.37 <br />Certification of Completion <br />Action <br />Originating Department <br />Public Works <br />with American Civil <br />First Reading <br />Contact Person <br />Tom Fuchs T� <br />Constructors West Coast,,;1c. <br />Second Reading <br />Phone Number <br />425-257-8931 <br />for WPCF North Outfall <br />Third Reading <br />FOR AGENDA OF <br />11/21/2007 <br />Protection Structure Project <br />Public Hearing <br />Total amount due to contractor <br />Initialed by: <br />is $0.00. <br />Department Head <br />CAA <br />Council President <br />- <br />Location Preceding Action Attachments Department(s) Approval <br />Water Pollution Control Bid: 4/17/2007 Final Contract Voucher Public Works <br />Facility Award: 5/02/2007 Certification, Certificate <br />of Completion, Final <br />Estimate <br />Amount Budgeted <br />$ 423,736.13 <br />Expenditure Required <br />$0 <br />Account Number(s): 3296 <br />Budget Remaining <br />$28,022.37 <br />Additional Required <br />$0 <br />DETAILED SUMMARY STATEMENT: <br />The general contractor, American Civil Constructors West Coast, Inc., completed the WPCF North Outfall <br />Protection Structure Project in accordance with the plans and specifications and to the satisfaction of the <br />Public Works Department. <br />The amounts paid the contractor under this contract are as follows: <br />Amount Paid to date is $395,713.76; Retainage Amount Withheld is $0.00. The remaining amount due is <br />$0.00. <br />By Council approving this action, the WPCF North Outfall Protection Structure Project will be accepted as <br />complete allowing release of the retainage bond. <br />RECOMMENDATION (Exact action requested of Council): <br />Accept the WPCF North Outfall Protection Structure Project as complete, and authorize the Mayor to sign <br />the Certificate of Completion with American Civil Constructors West Coast, Inc. allowing release of the <br />retainage bond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.