Laserfiche WebLink
ATTACHMENT A-3 <br />SCOPE OF WORK <br />GEOTECHNICAL AND PIPELINE ENGINEERING <br />36"' STREET SEWER PROTECTION PROJECT PHASES 3 AND 4 <br />For <br />Cit` of Everett Department of Public Worhs <br />October 30, 2007 <br />PHASE: 3 - SOUTH END IN'T'ERCEPTOR EXTENSION - STATION 186 PIPELINE <br />PROTE(:TION <br />PHASE 4 - SN0HON,I.1SH REVER CSO INTERCEPTOR - ECLIPSE PIPELINE; <br />PROTECTION <br />9 <br />