My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/11/28 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/11/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 8:25:31 AM
Creation date
3/20/2017 9:42:39 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/28/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br />4 REVISED FINAL CONTRACT VOUCHER CERTIFICATION <br />CONTRACTOR:Marshbank Construction ADDRESS: PO Box 97 <br />CITY: Lake Stevens STATE: WA 98258 DATE: November 7, 2007 <br />PROJECT TITLE: 112`h St. SE Improvements, Phase 2 WORK ORDER NO. 2440A, 2440B & 3229 <br />DATE WORK COMPLETE: July 7, 2007 FINAL AMOUNT: $ 3,787,620.73 <br />CONTRACTOR'S CERTIFICATION <br />I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br />and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br />authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br />employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br />monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br />understand the same and that I hereby release the City of Everett from any and all claims of whatsoever nature <br />which I may have, arising out of the performance of of said contract, which are not set forth in said estimate. <br />X frY X � <br />CO CTOR ') ��� I�,sPsf�?A*TITLE � `' S�E�P <br />� <br />RA11,, <br />Marshbank Construction0 <br />r=y�o�aRr ' y <br />sZ` psoi <br />Subscribed and sworn to before ,,ue� <br />m t' d of 5 -yam <br />X Notary Public ///1/ `PA ,41 Wkmo"`V�p <br />in nd for the State of Washington, residing at sYl�( E OF <br />PUBLIC WORDS DEPARTMENT CERTIFICATION <br />I Certify the attached final APPROVED Date: <br />estimate to be based upon actual <br />measurements and to be true and correct. _ jJ <br />X :�� X �Y <br />Construction Manager Utilities Director <br />Tom Fuchs Tom Thetford <br />INSTRUCTIONS <br />The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br />agents and forwarded with the Final Contract Voucher Certification. <br />Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br />attached. <br />Revised 9/94 <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.