My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/01/16 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/01/16 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2017 11:32:57 AM
Creation date
3/20/2017 11:32:13 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/16/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dec 27 2007 3: 37PM MTC Inc. 360-755-1980 p. 11 <br /> Materials Testing Consulting, Inc. <br /> 10'1 1111XN111- <br /> Geotechntcal Engineering •Materials Testing•Special Inspection•Environmental Consultir <br /> itt <br /> Project: Everett Clearwell Storage No. 2 and CFDS, Sultan <br /> Materials Testing and Special Inspection Budget Estimate <br /> Earthwork Testing Units Qty Rate Cost <br /> Compaction testing of soils, subgrade observation hours 50 $55.00 $2,750.00 <br /> Nuclear Densometer Usage each 10 $25.00 $250.00 <br /> Proctor/Gradations each 3 $235.00 $705.00 <br /> Subtotal <br /> $3,705.00 <br /> Cast-In-Place Concrete Inspection <br /> Reinforced Concrete(64 placement dates) hours 400 $55.00 $22,000.00 <br /> Compression Test Cylinders(64 sets of 5 cytdinders) each 320 $20.00 $6,400.00 <br /> Concrete Shrinkage Test Samples(ASTM C157,20 sets of 3 samples) each 60 $100.00 $6,000.00 <br /> Concrete Potential Reactivity Samples(ASTM C1260) each 6 $425.00 $2,550.00 <br /> Subtotal <br /> $36,950.00 <br /> Other Costs <br /> Project Management hours 50 $70.00 $3,500.00 <br /> Travel mileage(120 miles round trip,amount of trips TBD) mile THD VA'tc S TBD <br /> +r <br /> Equipment overhead and contingencies(5%of costs) o Sz $2,207.75 <br /> Total $46,362.75 <br /> Proposal valid for 90 days past December 13,2007 Page 1 of 1 <br /> Submitted By: Authorized By: <br /> Brian Steele Company/Organization <br /> Geotechnical Division Manager <br /> Signature and Date <br /> Name and Title <br /> Additional time for meetings,consultation,follow-up correspondence,regulatory liaison,or other work beyond the scope outlined above wilt be the <br /> in accordance with the terms and conditions noted In the attached Fee Schedule and Service Agreement. <br /> r rm <br /> 777 Chrysler Dr.•Burlington,WA 98233•360-755-1990•Fx 360-755-1980 <br /> 2126 East Bakervlew Rd.,Ste.#101 •Bellingham,WA 98226.360-647-6061 -Fx 360-647-8111 <br /> 1710 Midway CI_•Centralia,WA 98531.-360-330-7926-Fx 360-330-7946 <br /> www_mtc-inc.net <br />
The URL can be used to link to this page
Your browser does not support the video tag.