My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/02/06 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/02/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2017 11:54:50 AM
Creation date
3/20/2017 11:54:46 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/6/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
: CITY t , EIVITI; f e: YER W ,4t k <br /> }'�1 _.w �. ,s r.•Q„, ,..:"�.k e.,, � _ �'.., .ue. � `L„s .... .,?a. a, .�. .aa6,,. ,ate�/ <br /> PROJECT TITLE: 3 <br /> X Consent COUNCIL BILL# <br /> Replacement of Water Action Originating Department Public Works <br /> Transmission Lines 2 & 3 — First Reading Contact Person Souheil Nasr.,, <br /> Phase 6 project. Second Reading Phone Number (425)257-72'0 <br /> Third Reading FOR AGENDA OF Feb. 6, 2008 <br /> Public Hearing <br /> Initialed by: <br /> Department <br /> CAA <br /> Council Presiden' g/121 <br /> Location Preceding Action Attachments Department(s) Approval <br /> Snohomish River Estuary Authorization to Sign Public Works <br /> between the Snohomish Professional Services <br /> River and Home Acres Agreement with MWH <br /> Road. Americas, Inc.to Complete <br /> Engineering Design and <br /> Permitting Services for <br /> Replacement of Water <br /> Transmission Lines 2 & 3 <br /> —Phase 6. <br /> Amount Budgeted $27,000,000 <br /> Expenditure Required $2,000. Account Number(s): <br /> Budget Remaining $26,998,000 UP 3141-3 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> The Replacement for Water Transmission Lines No. 2 & 3 —Phase 6 project is ready to advertise for <br /> construction bids. This project will replace approximately 8,000 feet of the existing elevated 48" diameter <br /> Water Transmission Lines No.2 & 3 between the Snohomish River and Home Acres Road Slough. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize a call for construction bids for the Replacement of Water Transmission Lines No.2 & 3—Phase 6 <br /> project. <br /> 4 <br /> S:\SNasr\TL Phases 6&7\Agenda-Bid Authorization 2_13_08.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.