Laserfiche WebLink
everett INSPECTION REPORT <br /> endd�ESs .. ,��.�, ; i� ,, <br /> Contractor �s'��+� rt <br /> �� <br /> Owner <br /> Date v`1�-r C� <br /> TYPE OF INSPECTION REQUESTED <br /> LDG: Pmt. No. Q-NT�CH: Pmt. No. ZZ�� �9 _ <br /> ❑ ELEC: Pmt. No. ❑ PLBG: Pml. No. <br /> ❑Temp. Elecl. ❑ Framing ❑Gas Piping <br /> ❑ Footing ❑ Drywe.11, Nailing ❑Consultation <br /> O Foundation ❑ Shear Nailing ❑ Groundwork <br /> ❑ Ductwork ❑ Grid ❑ $lruct Slab <br /> ❑Wood Stove ❑ Rough•In L�3'Final <br /> ❑ Masonry ❑Service ❑ <br /> PPROVAL ❑ PARTIAL APPROVAL <br /> ❑ VIOLATION ❑ CORRECTION REQUIHED <br /> ❑ Corrections listed below MUST BE MADE betore work can be approved. <br /> ❑ Please contacl inspector and arrange for appointment. <br /> p Was not able to perform inspection. <br /> ❑ CALL 259-8810 FOR REINSPECTION — 24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIQR TO OCCUPANCY. <br /> Inspector Date ��`� -/l. <br /> __�/ <br />