Laserfiche WebLink
/.+ <br /> t' <br /> David Foster n�'�(�'-�' f / <br /> From: Frank Del Gaudio[fdg@fishersons.comJ <br /> Sent: Thursday, August 26, 2010 2:21 PM <br /> To: Chris Lang; Joel Knechtel <br /> Cc: Jon Rodin Qonr@patrio�re.com); John Lohrer Qohn@lightningelectricllc.com); David Foster; <br /> Ryan Ellinghaus (ryan@2812architecture.com); Jaimin Woody(JWoody@MotorTrucks.Net); <br /> Jim Carroll Qim.carroll@thyssenkruppeievator.com); Scott Chritton (scott@rhmech.com); Oly <br /> Olsen (oly@cpiplumbing.com); hlevens@msn.com; Jeromy Leonard <br /> Qeromy@hytechydronics.com); kforsberg@mts-services.com; Thomas. M. Wisuri <br /> Subject: Elevator-Everett Motor trucks <br /> Attachments: hppscan115.pdf �J5 � I VE2S )Or �G�� — <br /> This is the lette of final acceptance f�om the Dept.of Labor and Industrie�for the elevator at E rett Motor Trucks.The <br /> elevator can no e used inside the building. I have scheduled the fire alarr�te morning at 9:00 am with <br /> the Everett fire dept. I hope to get a building final after all the electrical and mechanical final permits are done. I will <br /> want all permits finalized by the middle of next week. — <br /> Frank Del Gaudio <br /> Project Superintendent <br /> Fisher&Sons <br /> 360-333-1083 <br /> fdR@fishersons.com <br /> 1 <br />