Laserfiche WebLink
Everett CIP 1996 to 2001 / Utilities <br /> UTILITIES (page 2 of 2) <br /> Map Funding <br /> - Sewer Location method 1996 1997 1998 1999 2000 2001 TOTAL <br /> Odor control -WPCF 1 1,4,5 $500 $1,800 $1,750 $250 $250 $0 $4,550 <br /> Lift station#1 -wet well 4 1 $500 $0 $0 $0 $0 $0 $500 <br /> WPCF Upgrade Plan 7 1,5 $100 $200 $500 $1,200 $2,000 $6,000 $10,000 <br /> Sanitary Sewer system replace 8 1 $500 $500 $900 $900 $1,000 $0 $3,800 <br /> L.S. #4 pressure line replaceme 10 1 $40 $260 $0 $0 $0 $0 $300 <br /> WPCF improvements 16 1 $73 $0 $0 $0 $0 $0 $73 <br /> CSO Plan update/ Port Gardner 24 1,2,3 $0 $0 $50 $100 $1,500 $1,500 $3,150 <br /> SEWER TOTAL $1,713 $2,760 $3,200 $2,450 $4,750 $7,500 $22,373 <br /> - Storm <br /> Compost filter- S.W. treatment 12A 1 $52 $0 $0 $0 $0 $0 $52 <br /> Evergreen Way storm drain 12B 1 $308 $0 $0 $0 $0 $0 $308 <br /> Ocean Ave. storm drain 12C 1 $115 $0 $0 $0 $0 $0 $115 <br /> Pigeon Creek#1 Channel Impro 12D 1 $40 $0 $0 $0 $0 $0 $40 <br /> Silver Lake Flood Control Plan 12E 1 $75 $0 $0 $0 $0 $0 $75 <br /> Silver Lake milfoil Removal 12F 1 $130 $0 $0 $0 $0 $0 $130 <br /> Stormwater improvements - Pro 12G 1 $0 $720 $720 $720 $720 $720 $3,600 <br /> STORM TOTAL $720 $720 $720 $720 $720 $720 $4,320 <br /> TOTAL WATER, SEWER, STORM $5,603 $12,650 $13,170 $17,620 $52,370 $39,820 $141,233 <br /> NET SEWER, STORM AND WATER $5,603 $10,780 $11,045 $9,120 $14,120 $14,320 $64,988 <br /> aVI• b,t k <br />