Laserfiche WebLink
Everett CIP 1996 to 2001 Disclaimer: The projects listed below, their potential funding sources, and projected cost <br /> estimates are subject to change. In some cases, the expected total project costs are greater <br /> Public Works - roadway improvements (Page 1 of 10) than the funding committed over the six year horizon. All figures should be considered <br /> rough, conceptual estimates at this time. <br /> Project Location Map Funding 1996 1997 1998 1999 2000 2001 Total Cost <br /> Location method <br /> Widen Evergreen Way SR 526 at Everett $1,500 <br /> overcrossing Evergreen Way Other $0 <br /> 1 total $225 $1,275 $1,500 <br /> 1-5 HOV median lanes 164th to SR 526 Everett $0 <br /> Other $50,000 <br /> 2 total $8,333 $8,333 $8,333 $50,000 <br /> SR 526 HOV reversible 1-5 to 34th Ave Everett $0 <br /> lane Other $25,000 <br /> 3 total $8,333 $8,333 $8,333 _ $25,000 <br /> 1-5 HOV lanes SR 526 to SR 2 Everett $0 <br /> Other $50,000 <br /> 4 total _ $8,333 $8,333 $8,333 $50,000 <br /> 41st Street ramp Broadway to 1-5 Everett $300 <br /> improvements Other $0 <br /> 5 total _ $230 $423 $423 $423 $1,500 <br /> HOV at interchange SR 96 (128th) at 1-5 Everett $400 <br /> and ramps Other $1,600 <br /> 6 total $1,800 $5,000 <br /> Interchange study & 1-5 at 12th, Pacific, Everett $500 <br /> improvements SR2, etc. Other $0 <br /> 7 total $500 $500 <br /> SR 525 (Paine Fld SR 526 to SR 99 Everett $11,600 <br /> Blvd) improvements Other $0 <br /> 8 total $3,000 $10,000 $23,000 $11,000 $11,000 $11,000 I $71,500 <br /> xhb;�r Q <br />