Laserfiche WebLink
Everett CIP 1996 to 2001 / Roadway Improvements & Transit <br /> Public Works- roadway improvements (Page 8 of 10) <br /> Project Location Map Funding 1996 1997 1998 1999 2000 2001 Total Cost <br /> location method <br /> R/W acquisition (phase II), Not determined Everett $205 <br /> PS&E Multimodal Other $2,150 <br /> Transportation Facility 62 total _ $2,650 $1,025 $3,655 <br /> R/W acquisition (phase II), Not determined Everett $3,060 <br /> PS&E Multimodal Other $0 <br /> Transportation Facility 63 total $3,800 $1,420 $5,220 <br /> Multimodal Transportation Not determined Everett $2,300 <br /> Facility phase III, Other $0 <br /> Facility construction 64 total $10,000 $3,333 $3,333 $3,333 $11,500 <br /> AVI improvements for transit SR 99 Everett $400 <br /> vehicles, transit priority Other $0 <br /> / HOV treatment 65 total $792 $792 $792 _ $2,375 <br /> AVI improvements, Transit/ Evergreen Way Everett $1,600 <br /> HOV treatment, Other $0 <br /> emphasis lanes 66 total _ _ $667 $667 $667 $2,000 <br /> Park-and-Ride lot Evergreen Way Everett $900 <br /> development Other $0 <br /> 67 total _ _ $1,500 $1,500 $1,500 $4,500 <br /> South Everett Transit Various locations _ Everett $47 <br /> center site selection Other $0 <br /> 68 total $235 _ $235 <br /> South Everett Transit Not determined Everett $600 <br /> Center design Other $1,900 <br /> and R/W acquisition 69 total $1,000 $2,000 I $2,900 <br />