Laserfiche WebLink
roadway described in Paragraph 3 is constructed according to City of Everett Design <br /> Standards, inspected and accepted by the City; and provided further however the <br /> construction of the realigned roadway shall be completed within 90 days from the date <br /> of authorization by the City Engineer for the clAo.ure of Paine Street. <br /> - 12A mak <br /> D D. ANSEN, Mayor <br /> ATTEST: <br /> CITY CLERK <br /> Passed: 10/16/95 <br /> Valid: 10/23/95 <br /> Published: 10/27/95 <br /> Effective Date: <br /> CF:judyc(ordinanc) <br />