|
BID TABULATION
<br />Sewer System Capacity Improvements "K" Phase I
<br />W.O.# UP 3271
<br />Date 4/1/2008
<br />Prepared By: William Barrett
<br />For: Dave Voigt, Project Engineer
<br />UNIT
<br />TOT.
<br />ITEM
<br />AMOU
<br />#
<br />ITEM DESCRIPTION
<br />UNIT
<br />UANTI
<br />I
<br />Mobilization
<br />LS
<br />1
<br />2
<br />Surveying
<br />LS
<br />1
<br />3
<br />Traffic Control Labor
<br />Hours
<br />5800
<br />4
<br />Maintenance & Protection of
<br />LS
<br />I
<br />57,500.(
<br />Traffic Control
<br />$43,500.(
<br />525.00
<br />5
<br />Street Cleaning & Sweeping
<br />LS
<br />1
<br />6
<br />Sawcutting Pavement, Final Joint
<br />LF
<br />12000
<br />Cut, Up to 6 -Inch Thickness
<br />7
<br />Sawcutting Pavement, Final Joint
<br />LF
<br />3100
<br />Cut, Up to 1 -Inch Thickness
<br />8
<br />Trench Excavation Safety System
<br />LS
<br />1
<br />9
<br />Temporary Sedimentation &
<br />LS
<br />I
<br />Erosion Control
<br />10
<br />Pavement Marking
<br />LS
<br />I
<br />I I
<br />Roadway Excavation and
<br />CY
<br />2900
<br />Embankment
<br />12
<br />Crushed Surfacing Top Course
<br />Tons
<br />140
<br />13
<br />HMA, CL 12" PG 64-22
<br />Tons
<br />2600
<br />ENGINEER'S ESTIMATE
<br />UNIT TOTAL
<br />PRICE AMOUNI
<br />$514,000.00 5514,000.00
<br />$20,000.00 $20,000.00
<br />$45.00 5261,000.00
<br />$12,000.00 $12,000.00
<br />$10,000.00 $10,000.00
<br />52.00 $24,000.00
<br />51.00 53,100.00
<br />580,000.00 S80,000.00
<br />$26,000.00 $26,000.00
<br />$12,000.00 $12,000.00
<br />546.00 $133,400.00
<br />$23.00 S3,220.00
<br />5150.00 $390,000.00
<br />Tri-State Construction
<br />UNIT
<br />TOT.
<br />PRICE
<br />AMOU
<br />$490,000.00
<br />$490,000.
<br />S50,000.00
<br />$50,000.
<br />538.00
<br />$220,400.
<br />$35,000.00
<br />S35,000.i
<br />540,000.00
<br />$40,000.
<br />$1.65
<br />$19,800.1
<br />50.55
<br />$1,705.1
<br />$240,000.00
<br />$240,0001
<br />$25,000.00
<br />525,000.(
<br />$7,500.00
<br />57,500.(
<br />$15.00
<br />$43,500.(
<br />525.00
<br />$3,500.(
<br />$90.00
<br />$234,000.(
<br />Thoraco Construction
<br />UNIT
<br />TOTAL
<br />PRICE
<br />AMOUNI
<br />$400,000.00
<br />$400,000.00
<br />$25,000.00
<br />$25,000.00
<br />542.00
<br />$243,600.00
<br />$55,000.00
<br />555,000.00
<br />$56,000.00
<br />556,000.00
<br />$2.30
<br />$27,600.00
<br />$0.70
<br />1
<br />$2,170.00
<br />$250,000.00
<br />$250,000.00
<br />$25,000.00
<br />$25,000.00
<br />$12,000.00
<br />$12,000.00
<br />$28.00
<br />$81,200.00
<br />$50.00
<br />$7,000.00
<br />$103.00
<br />5267,800.00
<br />Frank Coluccio Const.
<br />UNIT
<br />TOT.
<br />PRICE
<br />AMOUI
<br />$76,000.00
<br />$76,000.
<br />$15,000.00
<br />515,000.
<br />$50.00
<br />$290,000.
<br />$75,000.00
<br />$75,000.
<br />150,000.00
<br />$50,000.1
<br />$3.00
<br />$36,000.1
<br />$0.50
<br />$1,550.1
<br />$85,000.00
<br />$85,000.1
<br />S15,000.00
<br />S15,000.1
<br />$12,000.00
<br />$12,000.1
<br />$30.00
<br />$87,0001
<br />$30.00
<br />$4,200.1
<br />5125.00
<br />S325,000.1
<br />Bidder #4
<br />UNIT
<br />PRICE
<br />TOTAL
<br />4OUNT
<br />50.00
<br />$0.00
<br />50.00
<br />$0.00
<br />$ 0.00
<br />$ 0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.Oo
<br />$0.00
<br />$0.00
<br />50.00
<br />CX)
<br />
|