Laserfiche WebLink
BID TABULATION <br />Sewer System Capacity Improvements "K" Phase I <br />W.O.# UP 3271 <br />Date 4/1/2008 <br />Prepared By: William Barrett <br />For: Dave Voigt, Project Engineer <br />UNIT <br />TOT. <br />ITEM <br />AMOU <br /># <br />ITEM DESCRIPTION <br />UNIT <br />UANTI <br />I <br />Mobilization <br />LS <br />1 <br />2 <br />Surveying <br />LS <br />1 <br />3 <br />Traffic Control Labor <br />Hours <br />5800 <br />4 <br />Maintenance & Protection of <br />LS <br />I <br />57,500.( <br />Traffic Control <br />$43,500.( <br />525.00 <br />5 <br />Street Cleaning & Sweeping <br />LS <br />1 <br />6 <br />Sawcutting Pavement, Final Joint <br />LF <br />12000 <br />Cut, Up to 6 -Inch Thickness <br />7 <br />Sawcutting Pavement, Final Joint <br />LF <br />3100 <br />Cut, Up to 1 -Inch Thickness <br />8 <br />Trench Excavation Safety System <br />LS <br />1 <br />9 <br />Temporary Sedimentation & <br />LS <br />I <br />Erosion Control <br />10 <br />Pavement Marking <br />LS <br />I <br />I I <br />Roadway Excavation and <br />CY <br />2900 <br />Embankment <br />12 <br />Crushed Surfacing Top Course <br />Tons <br />140 <br />13 <br />HMA, CL 12" PG 64-22 <br />Tons <br />2600 <br />ENGINEER'S ESTIMATE <br />UNIT TOTAL <br />PRICE AMOUNI <br />$514,000.00 5514,000.00 <br />$20,000.00 $20,000.00 <br />$45.00 5261,000.00 <br />$12,000.00 $12,000.00 <br />$10,000.00 $10,000.00 <br />52.00 $24,000.00 <br />51.00 53,100.00 <br />580,000.00 S80,000.00 <br />$26,000.00 $26,000.00 <br />$12,000.00 $12,000.00 <br />546.00 $133,400.00 <br />$23.00 S3,220.00 <br />5150.00 $390,000.00 <br />Tri-State Construction <br />UNIT <br />TOT. <br />PRICE <br />AMOU <br />$490,000.00 <br />$490,000. <br />S50,000.00 <br />$50,000. <br />538.00 <br />$220,400. <br />$35,000.00 <br />S35,000.i <br />540,000.00 <br />$40,000. <br />$1.65 <br />$19,800.1 <br />50.55 <br />$1,705.1 <br />$240,000.00 <br />$240,0001 <br />$25,000.00 <br />525,000.( <br />$7,500.00 <br />57,500.( <br />$15.00 <br />$43,500.( <br />525.00 <br />$3,500.( <br />$90.00 <br />$234,000.( <br />Thoraco Construction <br />UNIT <br />TOTAL <br />PRICE <br />AMOUNI <br />$400,000.00 <br />$400,000.00 <br />$25,000.00 <br />$25,000.00 <br />542.00 <br />$243,600.00 <br />$55,000.00 <br />555,000.00 <br />$56,000.00 <br />556,000.00 <br />$2.30 <br />$27,600.00 <br />$0.70 <br />1 <br />$2,170.00 <br />$250,000.00 <br />$250,000.00 <br />$25,000.00 <br />$25,000.00 <br />$12,000.00 <br />$12,000.00 <br />$28.00 <br />$81,200.00 <br />$50.00 <br />$7,000.00 <br />$103.00 <br />5267,800.00 <br />Frank Coluccio Const. <br />UNIT <br />TOT. <br />PRICE <br />AMOUI <br />$76,000.00 <br />$76,000. <br />$15,000.00 <br />515,000. <br />$50.00 <br />$290,000. <br />$75,000.00 <br />$75,000. <br />150,000.00 <br />$50,000.1 <br />$3.00 <br />$36,000.1 <br />$0.50 <br />$1,550.1 <br />$85,000.00 <br />$85,000.1 <br />S15,000.00 <br />S15,000.1 <br />$12,000.00 <br />$12,000.1 <br />$30.00 <br />$87,0001 <br />$30.00 <br />$4,200.1 <br />5125.00 <br />S325,000.1 <br />Bidder #4 <br />UNIT <br />PRICE <br />TOTAL <br />4OUNT <br />50.00 <br />$0.00 <br />50.00 <br />$0.00 <br />$ 0.00 <br />$ 0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.Oo <br />$0.00 <br />$0.00 <br />50.00 <br />CX) <br />