My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/04/23 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/04/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2017 10:54:32 AM
Creation date
3/22/2017 10:53:38 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/23/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> AMENDMENT TWO <br /> to <br /> PROFESSIONAL SERVICES AGREEMENT <br /> for <br /> SKATEPARK DESIGN SERVICES WITH <br /> GRINDLINE SKATEPARKS,INC. <br /> This AGREEMENT, entered into the day of April 2008,constitutes Amendment No. 2 to <br /> the"Agreement"between the City of Everett,"the CITY"and Grindline Skateparks,Inc.,herein <br /> after called the"CONSULTANT",entered into on the 9th day of February, 2007. <br /> WITNES SETH: <br /> WHEREAS, Section 8.0 of the Agreement provides for adjustment or modification of the <br /> Agreement by mutual consent of the CITY and the CONSULTANT; and <br /> WHEREAS, The City entered into a professional services agreement with the Consultant to <br /> provide design development,community presentations, construction drawings and specifications, <br /> cost and material quantity estimates,bid set preparation and construction administration for the <br /> Wiggums Hollow Skatepark for the Parks and Recreation Department;and <br /> WHEREAS,the City has requested that the CONSULTANT perform work requiring additional <br /> technical coordination and site visits due to unforeseen circumstances during construction; and <br /> WHEREAS,the need for additional technical coordination and site visits are necessary to <br /> complete construction administration which requires a need to modify the Agreement; and <br /> WHEREAS,the number of construction site visits is increased from six to eight and sixteen <br /> hours of technical coordination is added; and <br /> WHEREAS,the CITY and the CONSULTANT have mutually agreed that there shall be no <br /> changes in completion date. <br /> NOW, THEREFORE,the CITY and the CONSULTANT mutually agree as follows: <br /> Section 1: of the Agreement is modified to change"Exhibit A—Scope of Work"to"Exhibit A <br /> and A-1 —Scope of Work". <br /> Section 4B: of the Agreement is modified to change"Exhibit B- Compensation"to "Exhibit B <br /> and B-1 —Compensation". <br /> Section 4D: of the Agreement is modified to change the total compensation,including all <br /> services and expenses,from a maximum amount not to exceed of Twenty Two Thousand Five <br /> Hundred Dollars($22,500.00)to a maximum amount not to exceed of Twenty Five Thousand <br /> Seven Hundred Dollars($25,700.00). <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.