Laserfiche WebLink
Landfill Systems and Related Utilities, all of which shall be executed by the parties and recorded <br />at Closing. <br />15. Dedication Agreement. The Parties agree that the Dedication, Easement and <br />Maintenance Agreement form attached to this Amendment as Exhibit I shall be signed, delivered <br />and recorded by the parties described therein at Closing and shall constitute the Dedication, <br />Easement and Maintenance Agreement referred to in Sections 7.2.9 and 16.6 of the Agreement. <br />16. Public Works Yard. The second sentence in Section 3.6 of the Agreement is <br />hereby amended to read as follows: <br />The City agrees to relocate the equipment and other personal property items on <br />the Public Works Yard as soon as reasonably possible after Closing but in no event later <br />than sixty (60) days after the Closing Date, and OM agrees to enter into a lease with the <br />City at Closing to permit the City to continue to use the Public Works Yard, without the <br />payment of rent but with an obligation to pay for all taxes, insurance (which insurance <br />shall include OM, its agents, employees, contractors and consultants as additional <br />insureds), utilities and other operational costs, until the Public Works Yard is vacated by <br />the City as provided herein (the "Public Works Yard Lease"). <br />17. Floodplain Clarification. The Parties acknowledge and agree that the Rate Map <br />has been clarified to OM's satisfaction, the City has fulfilled its obligations under Section 5.3 and <br />that the contingency described in Section 6.1.3 has been satisfied. Section 5.3 is hereby <br />amended to read as follows, and the figure in Exhibit B-2 is replaced by the current FEMA Rate <br />Map of the Simpson Pad: <br />"The Federal Emergency Management Agency ("FEMA") has corrected its Flood <br />Insurance Rate Map (the "Rate Map") to reflect the determination by the Flood <br />Insurance Study (effective September 16, 2005), and the current designation shown on <br />Exhibit B-2 has been clarified to OM's satisfaction." <br />18. Development Expenditures. The Parties acknowledge and agree that OM has <br />complied with and fulfilled its obligations under Section 5.4. <br />19. The Development Plan. The following shall amend and qualify Section Lb. of <br />the Development Plan and Section 1 and 2 of the Conceptual Layout of the Everett Riverfront <br />Development component set forth in Exhibit G of the Agreement: <br />If the Simpson Pad or the Mill Property cannot be used for residential <br />development because of the presence of any Hazardous Substances located thereon, then <br />the Conceptual Layout of the Everett Riverfront Development would allow the <br />development of the Simpson Pad or Mill Property for a high quality mixed use, high <br />technology business park, educational or office type facilities in a campus setting, <br />consistent with the Everett Shoreline Master Program, provided it is otherwise <br />compatible with the uses and other elements of the Development as described in Exhibit <br />1 . 1 11.. v7iTi7. KIrm <br />