My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/04/30 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/04/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 8:14:07 AM
Creation date
3/22/2017 11:37:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/30/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) The City will construct a two (2) lane roundabout (including curb, <br />gutter, sidewalk, streetlights and storm drainage improvements) on 41st Street <br />east of the 41st Street/BNSF overcrossing (the "Roundabout") and extend 41st <br />Street to the northwest corner of the Simpson Pad (the "41st Street Extension') <br />with a roadway that includes curb, gutter, pedestrian and bicycle way, streetlights <br />and storm drainage improvements. By January 31, 2009, the City will provide a <br />proposed design to OM for the Final Roundabout and 41st Street Extension. If <br />OM accepts the City's proposed design by February 28, 2009, then The City shall <br />use its best efforts to substantially complete the Roundabout and 41St Street <br />Extension by May 30, 2010 but in no event later than July 2010. The City will <br />provide OM with temporary construction access to the Landfill Pad and Simpson <br />Pad from September 1, 2008 until the Roundabout and 41st Street Extension are <br />completed. <br />(d) The City will construct an extension of the roadway from Pacific <br />Avenue to 36th Street (the "Main Road Extension). The Main Road Extension <br />shall provide for at minimum two (2) paved travel lanes each 14 feet in width (28 <br />feet in total width), together with pedestrian and vehicular improvements at <br />Chestnut and Pacific Avenue as shown and described in Exhibit J attached hereto. <br />The Main Road Extension shall include storm water collection at the road <br />shoulder, treatment and outfall system. Existing and future utilities will align <br />under the Main Road Extension. The City will install a sanitary sewer line for <br />discharge at the 36th Street pump station. Substantial completion of the Main <br />Road Extension shall occur by May 1, 2011. <br />(e) The City shall grade, fill and surcharge all Landfill Pad north of <br />41" Street, including demolition of designated utilities and structures and clearing <br />and grubbing. Surcharge shall be conducted in two phases according to the <br />grading and surcharge plans and specifications prepared by OM and submitted to <br />City for inclusion in the City's grading and surcharge contract documents (the <br />"Grading/Surcharge Plans"). The Phase 1 surcharge shall occur in the area <br />generally defined by the Main Road connecting 41St Street and 36th Street. The <br />Phase 2 surcharge shall occur in the remaining areas north of 41St Street on the <br />Landfill Pad. Grading for both Phases shall include but are not limited to: <br />removal/replacement of cap and balance soils across site, importing fill as needed <br />for drainage and grade, with the City providing temporary erosion and sediment <br />control plan for both Phase 1 and Phase 2 per City of Everett Standards. <br />Surcharge is estimated to be fifteen (15) feet high and for a 10 month duration <br />from the last placement of surcharge soils on the Phase. Surplus material from <br />Phase 1 meeting the Grading/Surcharge Plans specifications may be used for <br />surcharge of Phase 2. Substantial completion of Phase 1 grading and surcharge <br />shall occur within thirteen (13) months (excluding any time lost due to grading <br />activity weather restrictions imposed by the OM site grading plan) after OM's <br />submittal of the Grading/Surcharge Plans for Phase 1 and the date the final EIS is <br />issued. Substantial completion of Phase 2 grading and surcharge shall occur by <br />the date that is the later of (i) the date that is thirteen (13) months after OM's <br />
The URL can be used to link to this page
Your browser does not support the video tag.