ATTACHMENT 1 <br />SCOPE OF WORK <br />For clarity in invoice management, the task numbers outlined below correspond to <br />the existing task numbers currently used by Kleinfelder on the Bond Street project. <br />Task 3 — Additional CAP Revision: The CAP will be revised based on Ecology <br />requirements for the document to be a Remedial Investigation, Feasibility Study, and <br />Cleanup Action Plan, including preparing and inserting information not previously <br />required. The requirements were a result of the City trying to enter the site into the <br />Puget Sound Initiative (PSI) grant program. This task also involves coordination with <br />the City's legal counsel, and attending and preparing for PSI meeting. <br />Task 4 — DOE VCP: Prepare for and attend pre -construction meetings with the <br />Department of Ecology Volunteer Cleanup Program to discuss the CAP. Also <br />includes cost to work with Ecology and counsel to bring about a no further action <br />determination for the site. <br />Task 5 — Bid Package: This task is being revised to provide bid appropriate <br />geotechnical, construction dewatering and environmental clean-up specifications for <br />use by the City in bidding and contractor selection process. This task includes <br />production of CSI formatted draft and final technical bid specifications for inclusion <br />by the City into their contract documents as required by the City on a fast-track <br />basis. <br />Task 6 — Project Management: Typical project management tasks including client <br />and subcontractor coordination, working with counsel, planning, contracting, cost <br />estimates, and invoicing are included in this task. <br />