Laserfiche WebLink
Project: Sewer I, Water J Replacement <br />Change Order No.I <br />Change Order Effective Date: January 15, 2008 <br />By Date: <br />Officer <br />Exhibit A—Description of Changed Work <br />Seven, (7), existing bid items are being modified under work order UP3264 by change order V. <br />Bid Item #4 — Traffic Control Labor. Modify this bid item by adding 3,000 hours of Traffic Control <br />Labor, at the unit price of $40.00/HR, resulting in a contract price increase of $120,000.00. <br />Bid Item #6 — Street Cleaning & Sweeping. Modify this bid item by adding 180 hours of Street <br />Cleaning & Sweeping, at the unit price of $100.00/HR, resulting in a contract price increase of <br />$18,000.00. <br />Bid Item #15 — Concrete Pavement Patch. Modify this bid item by adding 507 square yards of <br />Concrete Pavement Patch, at the unit price of $100.00/SY, resulting in a contract price increase of <br />$50,700.00. <br />Bid Item #16 — Gravel Borrow. Modify this bid item by adding 7,500 tons of Gravel Borrow, at the <br />unit price of $16.00/TN, resulting in a contract price increase of $120,000.00. <br />Bid Item #26 — Combined Sewer Pipe, 21 -inch diameter, PVC, F679 Type 1. Modify this bid item <br />by adding 653 linear feet of Combined Sewer Pipe, 21 -inch diameter, PVC, F679 Type 1, at the unit <br />price of $105.00/LF, resulting in a contract price increase of $68,565.00. <br />Bid Item #29 — Combined Sewer Pipe, 24 -inch diameter, HDPE, DR 17, Installed by Pipe <br />Bursting. Modify this bid item by deleting 480 linear feet of Combined Sewer Pipe, 24 -inch diameter, <br />HDPE, DR 17, Installed by Pipe Bursting, at the unit price of $260.00/LF, resulting in a contract price <br />decrease of $124,800.00. <br />Bid Item #42- Concrete Sidewalk Restoration, 4 -Inch Thick. Modify this bid item by adding 250 <br />square yards of Concrete Sidewalk Restoration, 4 -inch Thick, at the unit price of $32.00/SY resulting <br />in a contract price increase of $8,000.00. <br />Net contract price increase as a result of the modifications made to the above seven existing bid items <br />comes to $260,465.00. <br />Page 3 of 6 <br />