My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/04/30 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/04/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 8:14:07 AM
Creation date
3/22/2017 11:37:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/30/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$VERET"T CITY C�TCII AB1A`i'F1 COEET <br />PROJECT TITLE: <br />Amendment No. 3 for a <br />contract time extension with <br />Brown & Caldwell for Design <br />of a Chlorine Building <br />Replacement at the Water <br />Filter Plant <br />Consent <br />X Action <br />First Reading <br />Second Reading <br />Third Reading <br />Public Hearing <br />COUNCIL BILL # <br />Originating Department <br />Contact Person <br />Phone Number <br />FOR AGENDA OF <br />14 <br />Utilities <br />John McClellan <br />8927 <br />April 30, 2008 <br />Initialed by: <br />Department Head <br />CAA <br />Council President <br />Location Preceding Action Attachments Department(s) Approval <br />Water Filtration Plant PSA Amendment No. 2 Amendment No. 3 Public Works - Utilities <br />9-7-07 <br />Amount Budgeted <br />$5,750,000 <br />Expenditure Required <br />$0 <br />Account Number(s): UP -3193-01 <br />Budget Remaining <br />$126,500 <br />Additional Required <br />$0 <br />DETAILED SUMMARY STATEMENT: <br />Brown & Caldwell consulting engineers prepared the plans and specifications for the new primary <br />disinfection facility for Everett's Water Filtration Plant, and are currently providing engineering support <br />during construction. Brown & Caldwell's .contract has expired prior to construction being completed, and <br />Utilities wishes to amend their contract to extend their performance period; no additional budget is required <br />for this amendment. <br />RECOMMENDATION (Exact action requested of Council): <br />Authorize the Mayor to sign Amendment No. 3 for a contract time extension with Brown & Caldwell for <br />design of a chlorine building replacement at the Water Filter Plant at no additional cost. <br />
The URL can be used to link to this page
Your browser does not support the video tag.