Laserfiche WebLink
• <br /> • <br /> The determination of value or valuation under any of the provisions of this Code <br /> shall be made by the Building Official. The value to be used in computing the <br /> building permit and building plan review fees shall be the total value of all <br /> construction work for which the permit is issued as well as all finish work, <br /> painting, roofing, electrical, plumbing, heating, air conditioning, elevators, <br /> fire-extinguishing systems and any other permanent equipment. <br /> and inserting in its place: <br /> Section 107.2 Permits and Inspection Fees. The fee for each permit shall be set <br /> forth in Table No. 1-A, as attached. <br /> The determination of value or valuation under any of the provisions of this Code <br /> shall be made by the Building Official. The value to be used in computing the <br /> building permit and building plan review fees shall be the total value of all <br /> construction work for which the permit is issued as well as all finish work, <br /> painting, roofing, electrical, plumbing, heating, air conditioning, elevators, <br /> fire-extinguishing systems and any other permanent equipment. The reference <br /> document to be used in determining the valuation for the purposes of fee <br /> calculation is the current building valuation data as published by the <br /> International Conference of Building Officials. <br /> 1. Temporary Structures. The fee for temporary structures, such as mobile <br /> homes, commercial coaches, prefabricated structures, modular <br /> structures, shall be $55.00. <br /> 2. Combination Fees. When all permits, including building (as set forth in <br /> Section 303(a)), plumbing and mechanical are issued on the same <br /> permit, then the plumbing and mechanical permit fees shall be waived <br /> and when the plumbing and mechanical permits are issued on the same <br /> permit, the plumbing and mechanical may be waived. However, <br /> equipment and fixture fees shall be paid as set forth by ordinance. <br /> 3. Alternate Fees. When a building, plumbing or mechanical permit is <br /> issued separately, the permit fee for each, together with all equipment <br /> and fixture fees, shall be paid as set forth by ordinance. <br /> Where work for which a permit is required by this Code is started or proceeded <br /> with prior to obtaining said permit, the fee specified in Table No. 1-A shall be <br /> doubled, but the payments of such double fee shall not relieve any persons from <br /> fully complying with the requirements of this Code in the execution of the work <br /> nor from any other penalties prescribed herein. <br /> 3 <br />