Laserfiche WebLink
• <br /> B. Port Gardner Neighborhood Improvements <br /> 1. Allocate $30,000 sidewalk repair through the Port Gardner Block <br /> Grant area. <br /> C. Riverside Neighborhood Improvements <br /> 1. Allocate $15,000 for street identification signs and for curbs and <br /> gutters on 25th Street west of Harrison Street. <br /> Section 3: Should costs be less for the above projects than originally estimated, similar <br /> projects, upon a vote of the Neighborhood, will be funded. If project costs <br /> exceed the estimates given, the lowest priority project or projects will be dropped <br /> for funding. <br /> Section 4: Authorization is hereby given to accumulate costs and distribute payments from <br /> Fund 369 to accomplish the "1994 Block Grant Neighborhood Improvements" <br /> Section 5: The total estimated cost of the improvements herein authorized is $60,000 which <br /> will include all costs related to design, construction, contract administration, plan <br /> development and associated costs. <br /> Section 6: The City Engineer of the City of Everett under the administration of the Mayor is <br /> hereby given the responsibility of providing for the pedestrian safety, street, sign <br /> and sidewalk improvements as defined herein. <br /> Section 7 The City Treasurer is hereby authorized to obtain interim financing which may be <br /> in any form permitted by law. Interim financing liabilities shall be paid by the <br /> Treasurer as soon as permanent financing monies, from sources as described <br /> elsewhere in this Ordinance, are received. <br /> Section 8: Funding. <br /> A. The sum of $60,000.00 is hereby appropriated to Fund No. 369, "1994 <br /> Community Development Block Grant Neighborhood Improvements", as <br /> follows: <br /> Program 001: Port Gardner Neighborhood Improvement $30,000 <br /> Program 002: Riverside Neighborhood Improvement $15,000 <br /> Program 003: Northeast Neighborhood Improvements $15.000 <br /> $60.000 <br />