My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 3/1/2017 Change Order 1
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 3/1/2017 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:17 PM
Creation date
3/23/2017 1:45:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
3/1/2017
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
UP3583 Puget Sound Outfall No. 6 Reroute
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0000178
Total Compensation
$91,109.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 7/25/2016
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Port Approval of Design. After receiving all Port comments,the City will <br /> submit its proposed final plans and specifications (and final form of approvals and easements)to <br /> the Port for approval, which approval will not be unreasonably withheld. The proposed final <br /> plans and specifications (and final form of approvals and easements) shall be accompanied by a <br /> prominent notice specifying"Commencement of Port's 30 Day Plans/Specifications Approval - <br /> PSO 6 Design Review Period" and shall be delivered to the attention of the Port's Notice Contact <br /> specified in Section 3.I. below. Plans and specifications delivered without the required notice or <br /> to someone other than the designated recipient shall not constitute proper delivery. The Port <br /> must either approve or disapprove in writing the City's proposed final plans and specifications <br /> within 30 days after they are delivered to the Port (the "PSO 6 Design Review Period"). If the <br /> Port does not provide the approval or disapproval to the City within the PSO 6 Design Review <br /> Period,the plans and specifications and approvals and easements are deemed approved. For the <br /> purposes of this Agreement,the term"PSO 6 Approved Plans and Specifications"refers to final <br /> plans and specifications that are approved under this Section 1.A.2, which includes final plans <br /> and specifications for Port Additional Work, if any. For the purposes of this Agreement, the <br /> term "PSO 6 Work" refers to all excavation, construction, materials, and other activities and <br /> items necessary to complete all improvements in accordance with the PSO 6 Approved Plans and <br /> Specifications,including without limitation Port Additional Work, if any. <br /> 3. Design Review Off-Ramp. If either Party determines during the PSO 6 <br /> Design Review Period, in the exercise of its reasonable discretion, that the construction of the <br /> PSO 6 work is not in its best interests or is not economical or technically feasible, then such <br /> Party may terminate Section 1 of this Agreement by delivery of written termination notice to the <br /> other Party no later than the end of the Design Review Period. In the event of such termination, <br /> the terminating Party will pay all costs incurred under Section 1 of this Agreement up to the date <br /> of termination. <br /> B. Permitting. <br /> 1. City to Obtain Permits. The City will apply for and obtain any necessary <br /> permits to allow for construction of the PSO 6 Work. The Port shall reasonably cooperate with <br /> the City in obtaining such permits. <br /> 2. Construction Easements. The Port will grant the City and the City's <br /> contractors any temporary construction easements or licenses necessary for the construction of <br /> the PSO 6 Work. The City will work with the Port to identify the contractor work areas, <br /> including lay down areas in an effort to minimize disruption of ongoing marine terminal <br /> operations. <br /> C. Procurement. <br /> 1. Construction Contract. After approval of the PSO 6 Approved Plans and <br /> Specifications and the receipt of all necessary permits for the PSO 6 Work, the City will call for <br /> bids and execute a construction contract for the PSO 6 Work in accordance with the City's usual <br /> procurement processes and the City's standard form construction contracts, with the Port added <br /> as an additional insured on the contractor's required liability insurance policies. If there is Port <br /> Additional Work, the City may bid the Port Additional Work as a separate bid schedule or bid <br /> 2 <br /> SOM103221\0081\00762427.V 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.