Laserfiche WebLink
SECTION 13 - MISCELLANEOUS PROVISIONS <br /> 13.1 Pretreatment Charges and Fees <br /> The Director may adopt reasonable fees for reimbursement of costs of setting up and <br /> operating the City's Pretreatment Program. <br /> These fees relate solely to the matters covered by this ordinance and are separate from all <br /> other rates or charges for sewer service, provided that the City shall collect said charges <br /> in the same manner as other sewer utility rates are collected, including but not limited to <br /> the sewer lien procedures provided under 35.67 RCW. <br /> Fees may include: <br /> A. Fees for wastewater discharge permits, including the cost of processing the permit <br /> applications, public noticing, issuing and administering the permit, and reviewing <br /> monitoring reports submitted by users; <br /> B. Fees for modifying or transferring permits. <br /> C. Fees for monitoring, inspection, surveillance and enforcement procedures <br /> including the cost of collection and analyzing a user's discharge; <br /> D. Fees for reviewing and responding to accidental discharge procedures and <br /> construction; <br /> E. Fees for preparing and executing enforcement action; <br /> F. Fees for filing appeals; <br /> G. Fees for High Strength Waste and Industrial Process flow; and <br /> H. Other fees as the City may deem necessary to carry out the requirements contained <br /> herein. <br /> I. Permit Fees <br /> A 5 year permit for a Significant Categorical User, Middle Tier Significant <br /> Categorical User, or a Significant Industrial User shall be $2200 <br /> A 5 year permit for a Non-Significant Categorical Industrial User or Zero <br /> Discharge User shall be $1000 <br /> r n <br /> 62 <br />