Laserfiche WebLink
Task 2 <br /> gib. <br /> City of Everett's 2008 Bridge Inspections <br /> .I ran '.,'each <br /> Tran • Knipe .LLC <br /> Task 2 -Identify Inspection Locations <br /> Task Items Project Senior Staff Clerical Total <br /> Manager Engineer Engineer <br /> Project Management 4 1 <br /> Identify Inspection Locations 8 16 <br /> Total Manhours 12 0 16 1 29 <br /> Direct Rates $ 55.50 $ 50.50 $ 31.50 $ 16.00 <br /> Total Direct Salary Cost $666 $0 $504 $16 $1,186 <br /> Profit at 30%of D.S. $356 <br /> Overhead at 1.54 times D.S. $1,826 <br /> Total Labor Cost $3,368 <br /> Total $3,368 <br /> Note—The sum of the above Profit and Overhead is equal to a combined multiplier of 2.84 <br /> • <br /> 1 v <br /> Page 3 <br />