Laserfiche WebLink
EVERETT CITY COUNCIL. AGENDA ITEM COVER SHEET <br /> LI <br /> PROJECT TITLE: <br /> Call for Bids for the Puget X Consent COUNCIL BILL# <br /> Sound Outfall 5 Overflow Action Originating Department Public Works <br /> Structure First Reading Contact Person Heather Griffin <br /> Second Reading Phone Number (425) 257-7206 <br /> Third Reading FOR AGENDA OF May 14, 2008 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Lift Station No. 3 Authorization to sign Map Public Works/Utilities <br /> HDR Engineering PSA <br /> May 7, 2007 <br /> a <br /> Amount Budgeted $400,000.00 <br /> Expenditure Required $1,000.00 Account Number(s): UP 2770 <br /> Budget Remaining $399,000.00 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The City has fourteen combined sewer overflow outfalls. All but four have had control projects to reduce <br /> overflow events to an average of one event per year over a five-year National Pollutant Discharge <br /> Elimination System (NPDES)permit cycle. Puget Sound Outfall 5 is one of the four remaining uncontrolled <br /> outfalls on Port Gardner Bay. <br /> HDR Engineering has reviewed the existing facilities at Puget Sound Outfall 5 and Lift Station No. 3 and has <br /> completed the design for these improvements. This project will construct a new structure to replace an <br /> outdated weir and improve the monitoring of overflow events at this location. The new facilities will also <br /> provide an increase in conveyance capacity for base flows to Lift Station No. 3. <br /> Information from this new monitoring configuration will be used in the design of the Bond Street CSO <br /> Control Facilities project. Construction plans for that project are required to be completed by the end of the <br /> year per the City's National Pollutant Discharge Elimination System permit for the Water Pollution Control <br /> Facility. <br /> RECOMMENDATION: <br /> 4 <br /> Authorize a Call for Bids for the Puget Sound Outfall 5 Overflow Structure. <br />