Laserfiche WebLink
PROJECT TITLE: `j <br /> Interlocal Agreement between Consent COUNCIL BILL# <br /> City of Everett and City of x Action Originating Department Engineering <br /> Marysville relating to First Reading Contact Person Ryan Sass <br /> Engineering Study for Everett Second Reading Phone Number (425)257 8942 <br /> Area Freight Mobility& Third Reading FOR AGENDA OF May 28, 2008 <br /> Access Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President -' /'l <br /> Location Preceding Action Attachments Department(s) Approval <br /> Everett Vicinity 5/14/08 Approved PSA Interlocal Agreement Legal <br /> with Perteet, Inc. <br /> Amount Budgeted ($14,288.00) <br /> Expenditure Required ($14,288.00) Account Number(s): PW3339 <br /> Budget Remaining -0- <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> This Interlocal Agreement will provide partial reimbursement for an updated freight mobility study that will <br /> position the City of Everett, Port of Everett, and the City of Marysville for future transportation funding and <br /> grant opportunities. <br /> The total cost of the freight mobility study is $142,880.00 and the Port of Everett and the City of Marysville, <br /> through Interlocal Agreements,will participate in the cost of this study at 45 and 10 percent shares <br /> respectively. <br /> RECOMMENDATION: Authorize the Mayor to sign the Interlocal Agreement between the City of <br /> Everett and the City of Marysville relating to the Engineering Study for the Everett Area Freight Mobility & <br /> Access 1. <br />