Laserfiche WebLink
R12 <br /> N <br /> Assumptions 14 <br /> Deliverables 14 <br /> 8.2 Subtask 802 — Engineering Field Services 14 <br /> Purpose 14 <br /> Consultant Services 15 <br /> City Responsibilities 15 <br /> Assumptions 15 <br /> Deliverables 15 <br /> 9.0 Task 900 — HDR QA/QC 15 <br /> 9.1 Subtask 901 — QA/QC 15 <br /> Purpose 15 <br /> Consultant Services 15 <br /> City Responsibilities 15 <br /> Assumptions 15 <br /> Deliverables 15 <br /> 10.0 Task 1000 — Additional Services 16 <br /> 10.1 Subtask 1001 — Provide Additional Services as Authorized by the City 16 <br /> Purpose 16 <br /> Consultant Services 16 <br /> City Responsibilities 16 <br /> Assumptions 16 <br /> Deliverables 16 <br /> 11.0 Task 1100 — Geotechnical (Zipper Zeman) 16 <br /> 11.1 Subtask 1101 — Geotechnical 16 <br /> Purpose 16 <br /> Consultant Services 16 <br /> City Responsibilities 17 <br /> Assumptions 17 <br /> Deliverables 17 <br /> 11.2 Subtask 1102 — Limited Hazardous Materials Sampling 17 <br /> Purpose 17 <br /> Consultant Services 17 <br /> City Responsibilities 17 <br /> Assumptions 18 <br /> Deliverables 18 <br /> 12.0 Task 1200 — Surveying (Perteet) 18 <br /> 12.1 Subtask 1201 — Surveying 18 <br /> Purpose 18 <br /> Everett Replacement of Water Transmission Line No. 2 iv <br /> Phase 8B Scope of Services <br /> 73 <br />