Laserfiche WebLink
9 <br /> City of Everett <br /> 41st Street Arterial/Broadway Arterial Improvements <br /> Scope of Work <br /> for <br /> HDR Engineering,Inc. <br /> Phase III—Construction Services(Retaining Wall) <br /> As a member of the Design Team for the project,HDR will provide engineering services <br /> during construction of the project. <br /> Tasks <br /> 1. Project Management,Coordination with the Prime Consultant and Design Team <br /> 1.1 HDR will perform project set up,monthly invoicing and status reports.Assumed duration of <br /> project construction is 6 months,extending from May 2008 through October 2008. <br /> 1.2 HDR will generally coordinate with the Design Team through email,phone,and ftp site. <br /> 1.3 One site visit or meeting,1 person. <br /> 2. Review of Retaining Wall Submittals <br /> 2.1.HDR will assist in providing submittal review for the structural earth wall and SEW traffic <br /> barrier.Contractor submittal should include calculations,layout,and details. <br /> 2.2.HDR will respond to Requests for Information(RFIs)regarding the retaining walls received <br /> from the City and/or Perteet.Project budget assumes 3 RFIs at approximately 3 hours effort <br /> each. <br /> Assumptions: <br /> • Submittals will consist of six copies for HDR review. <br /> • Submittals are managed through Perteet as the prime consultant or directly from the <br /> City. <br /> • The budget is an allowance.Quality of the submittals not in HDR's control may <br /> entail the need for additional budget.HDR will keep Perteet informed as to the status <br /> of submittal reviews and associated budget requirements. <br /> Draft Scope of Work(HDR) Page 1 of 1 <br /> By Joyce Lem,April 23,2008 <br /> DOT Form 140-063 EF J:\Trans_Design126066-41st St Arterial-Broadway Scoping Study\Project Management\Contracts\Supp 5_06-09-08.doc <br /> Revised 9/2005 Page 15 <br />