My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/07/02 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/07/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 11:43:34 AM
Creation date
3/24/2017 11:42:57 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/2/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Exhibit "A" <br /> City of Everett <br /> East Marine View Drive <br /> PHASE IV: Construction Observation and Administration Services <br /> Supplemental Agreement No. 1 <br /> INTRODUCTION <br /> This project involves the development of corridor improvements along East Marine View Drive, <br /> from the northbound I-5 off ramp to the SR 529-Broadway Ave on/off ramp within the City of <br /> Everett. Improvements include roadway enhancements and non-motorized trail facilities to connect <br /> similar facilities to the south and north of the project area. This supplemental agreement will reflect <br /> changes to the following areas of the original scope of services. <br /> SCOPE OF SERVICES DEFINED <br /> Phase IV—Construction Observation & Administration Services <br /> The scope of services for construction engineering services by the Consultant for the federally <br /> funded East Marine View Drive project is supplemented with the following. <br /> General Assumptions <br /> • Perteet replaced City provided Construction Observer with a Senior Construction Observer <br /> Lead effective May 12, 2008 until the completion of the project. <br /> 2. CONSTRUCTION ADMINISTRATION <br /> 2.17 Maintain files. <br /> • Project photographs (digital format). Perteet furnished digital cameras to <br /> Construction Observers. <br /> Summary of Office Administration (Record Keeping): <br /> 1. Provide one full time on-site Construction Manager, one Senior Construction Observer, <br /> and one Construction Observer. <br /> 3. CONSTRUCTION OBSERVATION <br /> Provide the services of one full-time on-site Construction Manager,one full-time Senior <br /> Construction Observer, and full-time Construction Observer on the project site who will observe <br /> the technical conduct of the construction, including providing day-to-day contact with the <br /> Contractor and the City. -+- <br /> East Marine View Drive Page 2 of 7 <br /> Supplemental Agreement No. 1 J:\Construction Services\27065-EMVD Contracts\Supp 1_06-09-08.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.