My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/07/16 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/07/16 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2017 8:27:36 AM
Creation date
3/27/2017 8:26:42 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/16/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Uw <br /> EVERVI'VCI'I`*COUNOI ,.A i ? iT - " tiPATA W,Y, <br /> �. r <br /> ._.-.:. __.. .-..r-, __. •. ,. .:..:... .....- ..,.._. .-......,. ...k.. _•4_.� .. .. .. v:';.:..i-:,.,t4-„... n:,'�S#,'iM,z,. ..rn�.�n'�...,.utta�:.Aso-z.-... ,,. ..F,. <br /> h Y <br /> PROJECT TITLE: Consent COUNCIL BILL# <br /> Waive the low Bidder's error X Action Originating Department Public Works <br /> and Award a Contract with First Reading Contact Person Carl Baird <br /> Razz Construction, Inc. for the Second Reading Phone Number 425-257-8852 <br /> Portal 4&6 Area Improvements Third Reading FOR AGENDA OF July 16, 2008 <br /> Project Public Hearing <br /> Initialed by: __ <br /> Department He./ <br /> / <br /> CAA _I ,I . <br /> Council President "O' <br /> Location Preceding Action Attachments Department(s)Approval <br /> Lake Chaplain watershed Budget Committee, July Bid tabulation Legal <br /> 9, 2008 <br /> Council approval to sign <br /> PSA Amendment No. 2, <br /> May 21, 2008 <br /> Council approval to sign <br /> PSA Amendment No. 1, <br /> Dec. 26, 2007 <br /> Council approval to sign <br /> original PSA, May 2, <br /> 2007 <br /> Amount Budgeted $860,000.00 <br /> Expenditure Required $513,786.60 Account Number(s): UP 3230-2 <br /> Budget Remaining $346,213.40 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> In July 2007, the City contracted with Murray, Smith&Associates,Inc. (MSA) to provide the required design <br /> engineering services for the Portal 4&6 Area Improvements Project. Improvements include replacement of valves and <br /> valve operators, a precast concrete access vault,pipeline corrosion control coatings,and relocation of the electrical <br /> system for a valving facility within the City of Everett Water System. <br /> NOTE: The Bidder's proposal for 36”pipe coating(#4) and 96"pipe coating(#5)state the total amount in <br /> words but the unit price in figures. The Bid Schedule requests the bidder to state the unit price in words. Since the <br /> unit price of$8/SF in#4 and$7/SF in#5 is consistent with total amount bid,it is recommended that the low Bidder's <br /> error in stating the total amount for the item, rather than the unit price in writing,be waived and the bid be accepted <br /> on the basis of the unit price of$8/SF for item 4 and$7/SF for item 5. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Waive the low Bidder's error and Award a contract with Razz Construction, Inc., for the Portal 4&6 Area <br /> Improvements Project in the amount of$513,786.60. <br />
The URL can be used to link to this page
Your browser does not support the video tag.