My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/07/16 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/07/16 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2017 8:27:36 AM
Creation date
3/27/2017 8:26:42 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/16/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: _ X Consent COUNCIL BILL# <br /> Call for Bids for the Primary Action Originating Department Public Works <br /> Sedimentation Basin Bypass at First Reading Contact Person Tim Marks <br /> the Water Pollution Control Second Reading Phone Number 8872 <br /> Facility Third Reading FOR AGENDA OF July 16, 2008 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President jt <br /> Location Preceding Action Attachments Department(s) Approval <br /> WPCF on Smith Island Council approval for <br /> design PSA 3-5-08 <br /> Amount Budgeted $300,000 Fund 339 <br /> Expenditure Required $1,000 Account Number(s): 401 <br /> Budget Remaining $250,000 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Operational requirements at the Water Pollution Control Fadility(WPCF) find it necessary to divert Primary <br /> Sedimentation effluent directly to the aeration ponds. A design has been completed that will install all <br /> necessary piping and valves to allow the flow to be diverted. Having completed the plans and specifications, <br /> the next step is to advertise for bids in order to complete the project. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize a call for bids for the Primary Sedimentation Basin Bypass at the Water Pollution Control Facility. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.