My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/08/20 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/08/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 9:03:23 AM
Creation date
3/27/2017 11:48:09 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/20/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />18. The Utility Building, which is a Phase 1 project in the Master Plan for the ECC <br />Property, is a project that will require administrative approval by the Director of <br />Planning consistent with the development standards and design guidelines of the <br />approved Master Plan. <br />NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br />Section 1. The Comprehensive Plan is hereby amended as follows: <br />A. The Comprehensive Plan land use map for the ECC Property, as described in <br />Exhibit A, is amended from College (2.2) to Hospital (2.4). <br />B. That the following amendments be made to the text of the Land Use Element: <br />Land Use Policy 2.11.4 Everett Community College and Providence Everett <br />Medical Center are large institutional facilities located in the Northwest Everett <br />neighborhood. In 2005, and again in 2008, City Council approved <br />Comprehensive Plan map amendments, along with master plans for both facilities <br />that are implemented through Institutional Overlay zones. The PEMC master <br />plan provides for phased hospital development_thfough-204r--s5 beyond 2030; while <br />the ECC master plan provides for phased development through 241-12015. <br />The 2005 approved PEMC expansion inetudes included significant intensification <br />of use on the existing hospital properties as well as expansion to the east of the <br />etiffent site. 1 to the eastwill result in the feleeation and/e <br />demel•t-on of a bleek f hemes in the Donovan Histell` Din�rin4 /Block 248). <br />FtAUFe expansions beyond the appr-oved 2015 developme it will r-equife addifiEffial <br />zone and G i_ensive Pi amendments. Pinar must A,efk with th <br />is must use existing hospital pr- 3pef4i as-� intensively, -e�� <br />No <br />further homes may be lost to hospital expansion beyond the approved Master <br />Plan. Future expansion to the east of Oakes Avenue beyond Block 248 is <br />16 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.