My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/08/20 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/08/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 9:03:23 AM
Creation date
3/27/2017 11:48:09 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/20/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY.COUNCIL AGENDA ITEM COVER SHEET <br />PROJECT TITLE: <br />Award Bid and Authorize <br />Mayor to sign a Contract with <br />G. G. Excavation Inc. for <br />Construction of Sewer System <br />Replacement "F" Project, <br />Schedule A <br />Consent <br />X Action <br />First Reading <br />Second Reading <br />Third Reading <br />Public Hearing <br />COUNCIL BILL # <br />Originating Department <br />Contact Person <br />Phone Number <br />FOR AGENDA OF <br />3 <br />PW/Utilities <br />David Voigt <br />425-257-8983 <br />AUR. 20.2008 <br />Initialed by: <br />Department Head <br />CAA <br />Council President <br />Location Preceding Action Attachments Department(s) Approval <br />Port Gardner -Call for Bids for Project Location Map <br />Neighborhood and Port Construction, 6/25/08 and Summary Bid <br />of Everett, See Attached -Budget Comm. 8/13/08 Tabulation <br />Project Location Map <br />ount Budgeted <br />$3,000,000. <br />enditure Required <br />ruc <br />$2,614,900.05 <br />Account Number(s):UP 3300-1 <br />get Remaining <br />$385,099.95 <br />ditional Required <br />$0 <br />DETAILED SUMMARY STATEMENT: <br />This project is located in the northwest area of the Port Gardner neighborhood (Rucker Hill) and crossing <br />BNSF (Burlington Northern Santa Fe) railroad onto the Port of Everett cargo terminal site connecting to City <br />of Everett Sewer Lift Station #2. The project replaces approximately 1,500 linear feet of deteriorated <br />combined sewer trunk mains and approximately 30 residential side sewer connections. The existing trunk <br />main is approximately 100 years old, moderately deteriorated and subject to possible failure. This project <br />will decrease the risk of failure and provide improved reliability of the system. <br />In addition, approximately 900 linear feet of new sewer pipes will be constructed by this project that will be <br />utilized by the proposed Bond Street Control Facility which is scheduled to be constructed in 2011. <br />Construction bids were received from twelve contractors on July 22, 2008, and a summary bid tabulation is <br />attached. The low bid amount is $2,614,900.05 from G. G. Excavation Inc., Anacortes, and the Engineers <br />Estimate was $3.4 million. Construction would occur from September 2008 through June 2009. <br />RECOMMENDATION (Exact action requested of Council): <br />Award bid and Authorize Mayor to sign a contract with G. G. Excavation Inc. for the Sewer System <br />Replacement "F" Project, Schedule A in the amount of $2,614,900.05 <br />C:\Documents and Settings\.SuClark\Desktop\Aug. 20 counciMV-Swr F Schl A Constr Award Agn-8-20-08.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.