Laserfiche WebLink
12/13/00 WEELBORG ENGINEERING ASSOCIATES Page 1 <br />ROSEWOOD PARK <br />_________________________�-�- ---- <br />BASIN SUGAlARY <br />BASZN ID: 100-OFFA <br />SBUH METHODOLOGY <br />TOTAL AREA.......: <br />RAINFALL TYPE....: <br />PRECIPITATION....: <br />TIME INTERVAL....: <br />ABSTRACTION COEFP: <br />TcReach - Sheet L: <br />TcReach - Shallow L: <br />PEAK RATE: 1.78 cfs <br />NAME: 100 Year Offsite "A" (Upper; <br />9.69 Acres <br />TYPElA <br />3.25 inches <br />10.00 min <br />BASEFLOWS: <br />AREA..: <br />CN....: <br />TC....: <br />0.00 cf:� <br />PERV <br />9.69 Acres <br />82.00 <br />53.95 min <br />0.20 <br />300.00 ns:0.2400 p2yr: 1.55 s:0.0250 <br />750.00 ks:9.00 s:0.0250 <br />VOL: 1.27 Ac-ft TIME: 490 min <br />BASIN ZD: 100-OFFB NAME: 100 Year Offsite "B" (Lowez) <br />SBUH METHODOLOGY <br />TOTAL AREA.......: 23.10 Acres HASEFLOWS: 0.00 cfs <br />RAINFALL TYPE....: TYPElA PERV <br />PRECIPITATION....: 3.25 inches AREA..: 23.10 Acres <br />TIME INTERVAL....: 10.00 min CN....: 82.00 <br />TC....: 114.80 min <br />ABSTRACTION COEFF: 0.20 <br />TcReach - Sheet L: 300.00 ns:0.2900 p2yr: 1.55 s:0.0115 <br />TcReach - Shallow L:1711.00 ks:5.00 s:0.0115 <br />PEAK RATE: 3.09 cfs VOL: 3.09 Ac-ft TIME: 550 min <br />HYDROGRAPH SUMMARY <br />PEAK TIME VOLUME <br />HYD RUNOFF OF OF Contrib <br />NUM RATE PEAK HYDRO Area <br />cfs min. cf\AcFt Acres <br />_________________________________-------- <br />1 9.652 590 187566 cf 32.79 <br />IMP <br />0.00 Acres <br />0.00 <br />0.00 min <br />IMP <br />0.00 Acres <br />0.00 <br />0.00 min <br />� <br />NOTE: HYD 1 IS THE hESULTANT OF ADDING 100-YEAR OFF-SITE HYDROGRAPHS "A" AND "B". <br />THEREFORE, THE TOTAL RESOLTANT OFF-SITE 100-YEF�R Q IS 4.652 CFS. <br />�� <br />