Laserfiche WebLink
c. How many pazking spaces would the completed project have? How <br />many would the project eluninate? <br />The site will have 70 parking spaces. <br />d. Will the proposal require any new roads or streets, or improvemenu to <br />existing roads or streets, not including driveways? If so, generally <br />describe (indicate whether public or private). <br />Standard frontage improvements will be required. <br />e. Will the project use (or occur in the itnmediate vicinity o� water, rail <br />or air transportation? If so, generally describe. <br />No <br />f. How many vehiculaz trips per day would be generated by the completed <br />project? If known, indicate when peak volumes would occur. <br />210.54 new average daily trips <br />g. Proposed measures to reduce or control transportation impacts, if any: <br />Payment of Traffic MiNgation Fees including 26B (Snohomish <br />County) fees, and WSDOT fees. <br />15. Public Services <br />a. Would the project result in an increased need for public services (for <br />example: fire protection, police protection, health care, schools, other)? <br />If so, generally describe. <br />Yes. The project will increase the need for pubGc services as would be <br />typical for any new residences. <br />b. Proposed measures to reduce or control d'uect impacts on public <br />services, if any. <br />Payment of schools, park, road mitigation fees; payment ot taies <br />16. Utilities <br />a. Circle utilities currently available at the site: electricity, nanual gas, <br />water, refuse service, telep6one, sanitaty sewer, septic system, other. <br />b. Describe the utilities that aze proposed for the project, the utility <br />providing the service, and the general construction activiries on the site or <br />in the immediate viciniry which might be needed. <br />Sewer: Mukilteo Water Distr'ct <br />Water: Mukilteo Water District <br />Telephone: GTE <br />Refuse: Rubatino <br />g�o <br />