My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10412 ROSEWOOD AVE ROSEWOOD PARK WHOLE SITE DEVELOPMENT 2017-04-07
>
Address Records
>
ROSEWOOD AVE
>
10412
>
ROSEWOOD PARK WHOLE SITE DEVELOPMENT
>
10412 ROSEWOOD AVE ROSEWOOD PARK WHOLE SITE DEVELOPMENT 2017-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 7:37:36 PM
Creation date
3/27/2017 1:38:10 PM
Metadata
Fields
Template:
Address Document
Street Name
ROSEWOOD AVE
Street Number
10412
Tenant Name
ROSEWOOD PARK WHOLE SITE DEVELOPMENT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snohomish County <br />Planning and Development Serv�ces <br />PRELIMINARY CERTIFICATE OF WATER AVAILABILITY <br />This certificate provides Planning a� i Development Services with information necessary to evaluate development proposals. <br />APPLICANT: John Kaleas <br />PLAT/SHORT PLAT NAME: RoseWOOd Pa�k <br />PROPOSED USE: <br />SITE LOCATION <br />3 Lol Short Plat with Conwrrent Rezone from R-7200 to LDMR <br />10430 Rosewood Av Everett <br />SW Corner of 104th Street SW, & Rosewood Avenue <br />Water Purveyor Information <br />PRELIMINARY REVIEW <br />PFN: <br />�, aj � Water will be provided by service connection only to an existing _ <br />feet from the site. (size� <br />b) � V'Jater service will require an improvement to the water system of: <br />� �� /Opc ��.— feet of water main to reach the site; ar. �/or <br />❑ 2) the construction of a distribution system on the site; andlor <br />� 3) other (describe) <br />00-100881 LU <br />2. a) 0 The water sysiem is in conformance with a County approved water comprehensive plan. <br />b) ❑ The water system improvement will require a water comprehensive plan amendment. <br />water main <br />3. a) � The proposed project is within the corporate limits of the district or has been granted Boundary Review Board <br />approval for extension of service outside the district or city or is within the County approved service area of a <br />private water purveyor. <br />b) ❑ Annexation or BRB approval wili be necessary to provide service. <br />4. Rate of Flow <br />❑ flow test of <br />e• <br />�calculationof /iIO� ' 9Pm <br />5. Duration <br />— ]�Iess than 1 hour <br />❑ 1 hour to z hours <br />� 2 hours or mcre <br />❑ other <br />Corn ments/C o n d i tio ns: <br />(Commercial building permits require ftow test or <br />calculation) <br />�r. <br />H��� i'J E�t,'nit: I � — <br />Projecc Number� (1(1 1 Q � �� � <br />I hereby ceRi(y that the a6ove waterpurveyorinlormation is t�ue. This certification shall be valid (orone year/rom date o(signature. <br />/Nir���� WA-�lL �%5/ l� j .l.N %1 <br />—' Agency Name Signato e <br />,�j��'G.[pt— .— — y G/G�_ �' <br />�� �e ignature � 1e <br />6775.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.