Laserfiche WebLink
(4) Self monitoring, sampling, reporting, notification, submittal of technical <br /> reports, compliance schedules, and record-keeping requirements. These <br /> requirements shall include an identification of pollutants to be monitored, <br /> sampling location, sampling frequency, and sample type based on Federal, <br /> State, and local law; and <br /> (5) Requirement for immediate notification to the City where self-monitoring <br /> results indicate non-compliance; <br /> (6) Requirement to report a by-pass or upset of a pretreatment facility; <br /> (7) Requirement for the SIU who reports non-compliance to repeat the <br /> sampling and analysis and submit results to the City within 30 days after <br /> becoming aware of the violation. <br /> (8) A statement of applicable civil, criminal, and administrative penalties for <br /> violation of pretreatment standards and requirements, and any applicable <br /> compliance schedule. <br /> B. Wastewater discharge permits may contain, but need not be limited to, the <br /> following conditions: <br /> (1) Limits on the average and/or maximum rate of discharge, time of <br /> discharge, and/or requirements for flow regulation and equalization; <br /> (2) Requirements for the installation of pretreatment technology, pollution <br /> control, or construction of appropriate containment devices, designed to <br /> reduce, eliminate, or prevent the introduction of pollutants into the <br /> treatment works; <br /> (3) Requirements for the development and implementation of spill control <br /> plans or other special conditions including management practices necessary <br /> to adequately prevent accidental, unanticipated, or routine discharges; <br /> (4) Development and implementation of waste minimization plans to reduce <br /> the amount of pollutants discharged to the POTW; <br /> (5) The unit charge or schedule of user charges and fees for the management <br /> of the wastewater discharged to the POTW; <br /> (6) Requirements for installation and maintenance of inspection and sampling <br /> facilities and equipment; <br /> (7) A statement that compliance with the wastewater discharge permit does <br /> not relieve the permittee of responsibility for compliance with all applicable <br /> Federal and State pretreatment standards, including those which become <br /> effective during the term of the wastewater discharge permit; <br /> (8) Any special agreements the Director chooses to continue or develop <br /> between the City and user; <br /> 25 <br />