My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1986-94
>
Ordinances
>
Ordinance 1986-94
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 11:31:10 AM
Creation date
3/28/2017 11:31:09 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1986-94
Date
1/12/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> .f"4/001VI <br /> ORDINANCE NO. 1986-94 '. • <br /> EVERETT <br /> AN ORDINANCE creating a special construction project entitled "SR526/I-5 <br /> Eastbound to Northbound Ramp", Fund 304, to accumulate all costs for <br /> construction of the ramp project. <br /> WHEREAS, the construction of a ramp to accommodate the easterly traffic movement of <br /> SR526 to the northerly traffic movement on Interstate 5 was identified as a Boeing EIS <br /> Mitigation measure; and <br /> WHEREAS, the City of Everett, the Washington State Department of Transportation and the <br /> Federal Highway Administration have developed the final design plans for the ramp; <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: <br /> A special construction project is hereby established as Fund 304, entitled "SR526/I-5 <br /> Eastbound to Northbound Ramp" to accumulate all costs for construction of the ramp project. <br /> Section 2: <br /> Authorization is hereby given to accumulate costs and distribute payments from Fund 304 for <br /> this construction project. <br /> Section 3: <br /> Authorization is hereby granted for the "Public Works Director", under direction of the <br /> Mayor, to assume full and complete responsibility for conducting all tasks and doing all things <br /> to accomplish the actions authorized in this ordinance. <br /> Section 4: <br /> The sum of$14,096,701 is hereby appropriated to Fund 304 "SR526/I-5 Eastbound to <br /> Northbound Ramp" as follows: <br /> A. Estimated Project Costs <br /> Construction $14,096,701 <br /> Total Estimated Cost $14,096,701 <br /> B. Source of Funds <br /> Boeing Mitigation (Fund 158) $12,865,854 <br /> ISTEA (Federal) 430,847 <br /> Traffic Mitigation (Fund 157) 800.000 <br /> Total Estimated Funds $14,096,701 <br /> Proj2525 Page 1 December 16, 1993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.