My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4492
>
Resolutions
>
Resolution 4492
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 11:35:32 AM
Creation date
3/30/2017 11:35:15 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4492
Date
10/1/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Non-Motorized Transportation Plan <br /> Project Summary List <br /> Project Estimated Cost' <br /> Project Description Priority <br /> Project Title <br /> Construct bike lanes in conjunction with sidewalk HI <br /> $1,800,000 <br /> 100th Street S.E.Connector & street widening project. <br /> Widen sidewalks on overpass to allow for bike HI <br /> $500,000 <br /> 112th Street Overpass • and pedestnan use <br /> Construction of bike lanes in conjunction wtih HI <br /> $500,000 <br /> Airport Road Connector street&sidewalk widening. <br /> Riverfront Trail CBD connector Public access connector in the CBD between the HI <br /> $425,000 <br /> Harborfront Harborfront trail system to theta i erf��Trail V tU <br /> -we t'lw l-k-i - v"f Octel <br /> ails <br /> ween the Interurban <br /> iverfront Trail connector trails srstedm Connector Riverfrontrsystem at 75th (Wood Creek) HI <br /> $1,500,000 <br /> InterurbanlR y <br /> and 52nd <br /> Design and construct separate bike lanes and HI <br /> $7,000,000 <br /> Paine Field Blvd Public Access Corridor sidewalks for public access in conjunction with <br /> new roadway alignment. <br /> Coordinate with Snohomish County <br /> on the design HI $650,000 <br /> Riverfront Trail East Segment <br /> and development of a public access trail along <br /> Lowell River Road to Snohomish <br /> . HI $200,000 <br /> Construct second leg of trail <br /> Riverfront Trail Phase II <br /> N Riverfront Trail Phase III <br /> Design and develop trail along existing right of HI <br /> $600,000 <br /> way of East Grand <br /> i HI <br /> $400,000 <br /> CEJ Pedestrian over pass <br /> Riverwalk Trail Overpass <br /> Note. 'Cost Estimates based on best available analysis of Project scope <br />
The URL can be used to link to this page
Your browser does not support the video tag.