My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4492
>
Resolutions
>
Resolution 4492
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 11:35:32 AM
Creation date
3/30/2017 11:35:15 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4492
Date
10/1/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAIL PLANNING CHRONOLOGY <br /> Everett Community Plan (Halprin Plan)--1969-72--Planning--Trails designed as secondary mode of <br /> transportation for schools, parks, and waterfronts. <br /> Parks & Open Space Plan--1972--Parks Staff& Lee Johnson Jongejan/Gerard--Necklace of pearls <br /> concept linking parks to schools. <br /> Parks and Recreation Comprehensive Plan--1978--Parks Staff&Northwest Research--Trails first <br /> identified as a capital improvements project starting with harborfront access, Forest Park. <br /> Silver Lake Public Access Plan--1984--Planning under a CZM Grant--Plan to design& development <br /> of public access around the lake. <br /> Snohomish River Trail--1986--Planning under a CZM Grant(Makers)--Plan to connect Everett to <br /> Snohomish along Lowell-Snohomish River Road. <br /> Parks and Recreation Comprehensive Plan--1986--Parks Staff& Carey Caldwell--Public access of <br /> the shorelines major trail component. <br /> Interurban Trail Plan--1987--Lynnwood Parks, Mount Lake Terrace Parks, Edmonds Parks, Sno Co <br /> Parks, Everett Parks--Design report for the development of a trail system in Snohomish County. <br /> Riverfront Public Access Plan--1987--Planning under a CZM Grant(Makers)--CZM design study <br /> for trail along riverfront. <br /> CBD Plan--1987--Planning (Thoresen/Peterson/Makers)--Called for trails connections between <br /> harborfront and river front. <br /> Harborfront Public Access Plan I--1988--Planning under a CZM grant (Makers)--CZM study to <br /> design public access along the harborfront. <br /> Interurban Phase One Engineering Report--1989--Macleod Reckord--Lynnwood to South Everett. <br /> Trail Plan--1989--Parks Staff--Comprehensive recreational trail plan. <br /> Interurban Phase Two--1991--Macleod Reckord--Design study from SR526 North to 41st. <br /> Harborfront Public Access Plan II--1991--Planning under a CZM Grant (Makers)--Revised public <br /> access plan with Port of Everett. <br /> Recreational Trail Plan II--1991--Parks Staff--Working document for comprehensive trail planning <br /> and design. <br /> Park& Rec. Comp Plan--1992--Parks Staff--Developed a separate component for trails. Adopted <br /> the City's first comprehensive trail plan. <br /> Smith Island Public Access Plan--1992--Planning under a CZM Grant (Atellier)--CZM study to <br /> connect Everett to Marysville. <br /> Non-Motorized Transportation Plan (ISTEA)--1993--Public Works, Parks--Plan was developed to <br /> meet ISTEA Grant requirements. <br /> Non-Motorized Transportation Plan (ISTEA) Part II--1994--Public Works, Parks--Plan was <br /> revised to meet ISTEA Grant requirements. <br /> Comprehensive Transportation Plan--1995--Transit under UMPTA Grant (Urban Mass Transit)-- <br /> Inter departmental non-motorized transportation plan. <br /> Silver Lake EIS--1995--Perteet Engineering--Transportation EIS that included public access in <br /> conjunction with road improvements. <br /> Comprehensive Trail Plan--1996--Parks, Public Works, Planning, & Transit--Draft plan developed <br /> inter departmentally. <br /> W:\PLANNING\TRAILS\COMP96.DOC 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.