Laserfiche WebLink
CITY OF EVERETT <br /> 1998 TO 2003 SIX-YEAR TRANSPORTATION IMPROVEMENT PLAN <br /> Interstates and Freeways Local Access <br /> 1. I-5 Corridor Improvement Study 1. Annual Street Overlays <br /> 2. SR 526/Evergreen Way Overcrossing 2. Neighborhood Traffic Mitigation Projects <br /> 3. 1-5 Median HOV Lanes(164th to SR 526) 3. Boeing Mitigation Park&Ride Lots <br /> 4. I-5 Median HOV Lanes(SR 526 to SR 2) 4. Pedestrian Improvements <br /> 5. I-5/41st Street Interchange and Auxiliary Lane 5. 12th Street Sidewalks(Rainier Ave.to Poplar St.) <br /> 6. I-5/Pacific Avenue Interchange 6. Madison Street Sidewalks(Highland to Broadway) <br /> 7. I-5/112th Street Interchange 7. Neighborhood Block Grant <br /> 8. Hewitt Avenue On-ramps to EB SR 2 8. Signal Master&Interconnect <br /> 9. SR 526 HOV Lane(I-5 to 34th Avenue) 9. Pavement Markings <br /> 10. HOV Treatment of SR 96/1-5 Interchange 10. Interim Traffic Signals <br /> 11. Developer Signals <br /> Principal Arterials 12. HES Projects <br /> 13. Roadway Hazard Elimination <br /> 1. 19th Avenue SE(SR 527) 14. Neighborhood Traffic Studies <br /> 2. Pacific Avenue/BNSF Railroad Overcrossing 15. Northern Extension of Interurban Trail,Stage II <br /> 3. Evergreen Way(108th to 112th) 16. Riverside Walkway,Phase II <br /> 4. Evergreen Way(Madison to Pecks) 17. Everett Nonmotorized Trail System <br /> 5. Evergreen Way(Pecks to 52nd) 18. City Entryway Landscaping and Signs <br /> 6. Evergreen Way(112th to S.City Limits) <br /> 7. Evergreen Way(47th to 41st) Transit <br /> 8. 41st Street (Friday to Rucker) <br /> 9. E.Marine View Dr.(Alverson to N.Broadway) 1. Bus Replacements(1999) <br /> 10. Everett Avenue(Norton to Waterfront) 2. Bus Replacements(2001) <br /> 11. East Marine View Drive(N.Broadway to 1-5) 3. Paratransit Vehicle Replacements(1998) <br /> 12. South Broadway Corridor Study 4. Paratransit Vehicle Expansion(1998) <br /> 13. Mukilteo Blvd./41st Street Corridor 5. Regional Fare Coordination Project <br /> and Pedestrian Study 6. Bus Stop Improvements <br /> 14. Arterial Needs Study 7. Operations Support Vehicles <br /> 15. Airport Road HOV Lanes 8. Transit O&M Facility Siting <br /> 16. Paine Field Blvd./SR 525 Corridor <br /> 17. SR 96 HOV Lanes HOV Projects <br /> 18. Paine Field Blvd.Extension Studies <br /> 1. Multimodal Transportation Facility(II) <br /> Minor Arterials 2. Multimodal Transportation Facility(II) <br /> 3. Multimodal Transportation Facility(III) <br /> 1. 38th Street Railway Overcrossing and Riverside 4. SR 99 North Transit Priority Project <br /> Parkway 5. SR 99/Evergreen Way Transit/HOV Treatment <br /> 2. 112th Street(SR 525 to SR 527) 6. South Everett Transit Center Design <br /> 3. 100th Street SE (SR 527 to 35th Ave. SE) 7. South Everett Transit Center Construction <br /> 4. 4th Avenue West(Holly Dr.to 88th St. SW) 8. North Everett Transit Center Siting <br /> 5. Seaway Boulevard(75th St. SW to 36th Ave.W.) 9. North Everett Transit Center Design <br /> 6. 100th Street SW(Evergreen Way to Airport Rd.) 10. North Everett Transit Center Construction <br /> Collector Arterials Other Transportation-related Projects <br /> 1. 36th Street P/R Lot and Access Improvements 1. Innovative Employer Programs(DIME) <br /> 2. 75th Street(Beverly Lane to Beverly Blvd.) 2. Expanded City Rideshare Program(MOVE) <br /> 3. Collector Arterial Needs Study 3. Implementation of State CTR Law <br /> 4. Riverside Industrial Park Bridge <br />