CITY OF EVERETT
<br /> 1998-2003 SIX-YEAR TRANSPORTATION IMPROVEMENT PLAN SUMMARY
<br /> PROJECT PROJECT PE RAN CONST. 98-2003 Load
<br /> Map
<br /> TYPE PRIORITY NAME TERMINI START START START COSTAponry No.
<br /> Marstata and Frewaya 1 I-2 Carrlder Improvement Study 112th Street S.E.to 12th SUM N.E. 9/98 _ $1,250,000 • EV1` 1
<br /> nterstala and Freeway 2 SR 526/Evergreen Way Overc*aairw SR 528 and Evergee eWay 4/96 8/97 $200,000 EVT 2
<br /> nterstatea and Freeway 3 45 Medical HOV Lana.164th UC,Revegstatlon 164th to SR 526 3/93 10/95 7/96 $11,000,000 ' WSDOT 3
<br /> nteretata and Freeway 4 1-5 Medan HOV Lana SR 526 to SR 2 8/98 8/2001 52002 $70,000,000 ' WSDOT 4 8 5
<br /> Meratata and Freeway 5 I.5/41st Street Intwchango and Auxiliary Lana alit Street to SR 2 9/99 8/2001 2/2002 50,000,000 ' WSDOT 6
<br /> nterstata and Freeway 6 I.SPactfic Ave.Intardranga Pacific Avenue and 1.5 8/99 8/2001 2/2002 56,000,000 • WSDOT 7
<br /> Marstata and Fraaway 7 1.51129/Street Interchange,Pyer Stop.P/R Lot 112th Street and I-5 8/99 8/2001 2/2002 512,000,000 ' WSDOT 8
<br /> nterstatea and Freeway 8 Hewitt Avenue On-ramps to SR 2 -Hawn Avenw,I.5,and SR 2 599 2001 $3,000,000 ' WSDOT 9
<br /> nterstata and Freeway 9 SR 526 HOV Lae 1.5 to 34th Avera 5/2002 2/2003 525,000,000 ' WSDOT 10
<br /> nterotatee and Freeway 10 FOV Treatment of SR 90/1.5 Interchange 128th Street S.EJI.S Inardtargs 3/94 8/98 $1,800,000 • WSDOT 11
<br /> Principal Arterials 1 19th Avenue SE(SR 527) 112th Street to 132nd Stat ,
<br /> 1/93 9/96 3/99 57,800,000 • EVT 12
<br /> Principal Arterials 2 Peale Avenue/BNSF Railroad Overdosing Pacific Ave.at BNSF Rail Line 2/99 3/2000 52001 510,000,000 • EVT 13
<br /> Principal Mesta 3 Evergreen Way 108th Street to 11291 Street 10/96 6,97 5434,000 EVT 14
<br /> Principal Mertala 4 Evergreen Way Madison Skeet to Pedis Dave 12/963/98 $900,000 EVT 15
<br /> Principal Arterials 5 Evergreen Way _Pecks Drive to 52nd Street 12/96 ' 3/98 51.100,000 EVT 18
<br /> Principal Metals 4 Evergreen Way 112th Street to Southern Coy Lime 4/99 W98 $309,000 EVT 17
<br /> Principal Arteriole 7 Evargraen Way 47th Street to 41.5 Street _1/2000 7/2000 ' $910,000 • EVT 18
<br /> PrincipalMerials 8 41st Street Rucker Ave.to Friday Ave. 598 8/98 2/99 $982,000 EVT 19
<br /> Principal Mensa 9 East Marna Viaw Drive ANerson Bridge to N.Broadway _ 11/95 4/96 7/97 $1,000,000 EVT 20
<br /> Principal Arterials _ 10 Evora Avaue Improvements Norton Avenue to Waterfront 3/2000 5/2002 $8,000,000 ' EVT/PORT 21
<br /> Principal Morals 11 East Marne Vuw Drive N.Broadway to 1.5 3/2000 52001 53,000,000 ' EVT 22
<br /> Principal Matta 12 South Broadway Corridor Study 41st Street to Beverly Blvd. 2/2000 5626400 EVT No Map
<br /> Principal Arterials 13 Muk.Blvd/41st St.Corr./Pad.Study Broadway to Dogwood/Olympic 2/2000 $100,000 • EVT 23
<br /> Principal Mends 14 Arterial Maeda Study Seaway,Broadway,1121h.eta 5/99 8250.000 • EVT No map
<br /> Principal Arterials 15 Airport Road HOV Lana Casino Road to SR 99 10/94 1/95 3/98 54,450,000 SNO CTY 24
<br /> Principal Arterials 16 SR 525/Paine Fold BNd.Projects SR 526 to I-S 12/91 9/95 9/96 885,000,000 • WSDOT 25&26
<br /> Principal Arterials 17 SR 96 HOV Lanes 1.5 to Duma Road 3/95 4/96 6/98 - $2,700,000 SNO CTY 27
<br /> Principal Arterials 18 Paine Feld Blvd.Ext.Study SR 526 to Mukata waterfront 6/2000 - $1.000,000 ' MUK 29
<br /> Minor Morias 1 3991 Street Raih ay Overeroaaing and Rh/oratda Parkway 41st Street Interconnect to Snohomish Riva Rd 2/99 1/2000 4/2001 516,000,000 • EVT 29
<br /> Minor Arterials 2 112th Street SR 527 to SR 525 2/93 1/97 4/98 515,500.000 - SNO CTY 30
<br /> Mina Arterials 3 100Th Street SE 19th Avenue to 359/Anent* 4/94 6/96 6/98 82.000.000 SNO CTY 31
<br /> Minor Manta 4 4th Avenue West Holy Drive to Seth Street S.W. 7/96 12/97 8,98 52.050.000 EVT 32
<br /> Minor Arterials 5 Sammy Blvd. 75th Street to 36th Street 2/2000 9/2000 52001 82,000.000 • EVT 33
<br /> Minor Arterials 6 100th Street SW Airport Rd to Evergreen War 2/2001 5200,000 • SNO CTY 34
<br /> Collector Arterials 1 36th Street P/R Lot and Access Improvements 36th Street.Broadway,41st Skeet 8/2000 52001 3/2002 515.000.000 ' EVT 35
<br /> Collector Arterials 2 75th Street Improvements Bavery Lane to Beverly Blvd. 10/96 11/97 6/98 $1,100,000 EVT 36
<br /> Collector Arterials 3 Collector Arterial Needs Study Various Locations 4/99 550,000 • EVT No map
<br /> Collector Arterials 4 Rivarsia Industrial Park Atha Bridge Vicinity of 1-5 and E.Manna View Dr. 1/2000 6/2000 7/2001 85,400,000 ' EVT 37
<br /> Local Aeras 1 Annual Street Overlays Venous streets within city 1/98 7/98 52.810,000 ' EVT No map
<br /> Local Axes 2 Neighborhood Milgation Projects Various locations within city 593 5600,000 EVT 38
<br /> Local Access 3 Boeing Mitigation P/R Lots Various locations within city 2/94 5/94 $1,000,000 EVT No map
<br /> Local Axaa 4 Pedestrian Improvements Various locations within city 1/98 6/98 $300,000 • EVT No map
<br /> Local Access 5 12th Strath Pedestrian Improvements Rainer Avenue to Poplar Street 1/96 6/99 $101400 EVT 39
<br /> Local Accoo 8 Madison Street Sidewalks Highland Drive to Broadway 1/99 6/99 $16,000 EVT 40
<br /> Local Access 7 Neighborhood Block Grants Various locations within city 1/98 5/98 5380,000 ' EVT No map
<br /> Local Axone 8 Signal Master 6 Interconnect Various locations with,,city 5/97 $550,000 • EVT No map
<br /> Local Access 9 Pavement Marking Projects Various locations withn ay 1/98 598 5180000 • EVT No map
<br /> Local Access 10 Interni Traffic Signals Various locations within city , 1/98 5/98 5900.000 ' EVT No map
<br /> Lout Access 11 Davetoper Sgsls Various locations within city 3/98 10/98 5600,000 • EVT 41
<br /> Lout Axes 12 HES Projects Various locations within dy 2/99 6/99 5550,000 ' EVT 42
<br /> Local Acoria 13 Roadway Hazard Elmination Venous locations within city 6/95 $120,000 ' EVT No map
<br /> Local Axon 14 Neighborhood Traffic Studies Various locations within city 2/98 570,000 • EVT No map
<br /> Lost Access 16 Northern Extension of Interurban Trail,Stage 6 Madison Street to 41st Street 11/97 3/95 3/99 5670,000 EVT 43
<br /> Local Aeons 16 Riverside Walkway.Phan II Pacific and Smith to N.Broadway 5/97 3/98 7/2000 5600,000 • EVT 44
<br /> Local Amass 17 Everts Nonmotonzad Trail System Various locations win city 5/98 10/98 9/99 $600,000 • EVT 45
<br /> Local Axes 18 City Entryway Landscaping and Signs Entryway corridors within city 3/98 7/98 5150.000 ' EVT No map
<br /> Transit Projects 1 Bs Replacements:1999;approx.6 buena N/A $1,900,000 ET No map
<br /> Trema Projects 1 Bus Rapaeementa:2001;approx.9 buses N/A 52,411,000 • ET Na map
<br /> Transit Projaets 1 Bs Replacements:2001;approx.7 names N/A 1/2001 51,976,000 ET No map
<br /> Transit Projects 1 Paratranait Vehicle Raplacamat:1996;approx.10 vehicles N/A $700,000 ET No map
<br /> Trostt Projects 1 Innen VMhiele Maintenance,942003 N/A $1,349,000 • ET No map
<br /> Transit Projects 2 Regional Faro Collection Project N/A $219,000 Metro No map
<br /> Transit Projects 2 Operations Support Vehicle N/A 7/2001 535,000 • ET No map
<br /> Transit Projects 2 Bus Stop Improvements N/A 5200,000 ET No map
<br /> Trenaf ProjMa 2 Transit O&M Facility Siting Study N/A W2001 5600,000 • ET No map
<br /> HOV Projects 1 Multimodal Transportation Facility Phase II Smith 8 Pacific 1/96 $3,300,000 ET No map
<br /> HOV Projects 1 Multimodal Transportation Facility Phase 11 Smith&Pacific 8/96 51,750,000 ET No map
<br /> HOV Project, 2 Muter-nodal Trasporason Facility Phaa III Smith 8 Pacific 8/99 $8,700,000 • ET No map
<br /> HOV Projects 2 SR 99 North/Evergreen Way FOV/Trend Priority SR 99,Evergreen Way 1/98 3/98 7/98 51,555,000 ' ET No map
<br /> HOV Projects 1 South Everts Transit Center,Design Everett Mall Area 7/97 541,000 ET No map
<br /> HOV Projects 1 South Everett Transit Cantor,Construction Everett Mall Ars 7/98 $250,000 ET No map
<br /> HOV Projects 1 North Everett Transit Center,Siang Everett C.C.Area $200,000 ET No map
<br /> HOV Projects 1 North Everan Transit Center,Design Everett C.C.Area 1/2000 5200,000 ET No map
<br /> HOV Projects 1 North Everett Transit Canter.Construction Everett C.C.Area 1/2001 5400.000 ET No map
<br /> TDM Projects 2 InnovaW.Employer Programs(DIME) N/A
<br /> 567,000 ET ,No map
<br /> TDM Projects 2 Exparxud CityRidahare Program(MOVE) N/A - $60,000 ET No map
<br /> TDM Projects 1 Implementation of State CTR Law N/A 5180,000 ET No map
<br /> Raglanal Trento 3 Bond Street Enhaneementa Bond Street W2000 01,000,000 RTA No map
<br /> Regional Transit 2 Pacific Avenue Overpass Pacific Avenue 2/2000 510.000.000 RTA No map
<br /> Regional Transit 1 112th Street HOV Access Ramps 112th Street S.E.and I.5 1/2003 56,000,000 RTA No map
<br /> Regional Trento 3 Multimodal Canter Commuter Rall Smith Street and Poodle Avenue 1/1999 $12,000,000 RTA No map
<br /> 'A portion or all of the funding for moss projects has not yet been committad.
<br /> NOTE:Projects shown in bold type wore not included in the 1997-2002 Six-year TIP.
<br /> 98tipom2.xls
<br />
|