Laserfiche WebLink
11�00 SE 8�"scrcei i�nzs�ns3�95m <br /> Suite 3d5 F 425�453�8208 � 1 r�- ��,� D <br /> 8ellevue.WA9B004 WVJIVPnC�1PJD.COM ���"� < <br /> lV�e�or�rodurn <br /> Date: May 9, 2014 <br /> To: Jane Zimmerman, P.E. <br /> City of Everett <br /> \From: Joe Taflin, P.E., LEED AP <br /> Sub'ect: Powder Mill Business Center — Phase 1 <br /> 1 <br /> Stormwater and Temporary Erosion Sediment Control (TESC; <br /> Design Memorandum <br /> Project Summary <br /> Phase 1 of the Powder Mill Business Center wiil invo�ve the clearing, qrading, site development, <br /> and utilities construction to support two industrial office/warehouse buildings. ''wo future <br /> office/warehouses buildings are planned for design and construction at a later date. Under tlie <br /> Phase 1 design/construction, the utilities and storm water conveyance systems have been <br /> designed for future building connections. Stubs for storm drainage, water, and sanitary side <br /> sewers have been incorporated into the desiqn. <br /> Stormwater Management <br /> The storm drainage system and detention/wet pond shown on the Phase 1 drawings were <br /> previously designed and approved in 2010 under the City of Everett Stormwater Manual, <br /> January 1997 and the 1992 Dept. of Ecology Stormwater Manual. <br /> The detention/wet pond layout and site area are unchanged from what was previously <br /> approved. Therefore, r. . revisions to the approved storm report are required. <br /> The previous storm drainage report that was a�proved by the City of Everett is titled Intermec — <br /> Lot 2 Preliminary Storm Drainage Ana(ysis, dated January 13, 2009 (kEVISED February 14, 2010). <br /> � 2 <br />