My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6301 36TH AVE W 2016-01-01 MF Import
>
Address Records
>
36TH AVE W
>
6301
>
6301 36TH AVE W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2017 8:53:57 AM
Creation date
3/31/2017 8:17:45 AM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
6301
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Poauc�a�{�s�I���,�aMr MAILED MAS COPY <br /> Utilities Division,3200 Cedar Street <br /> Everett WA 98201 <br /> 425-257-880C <br /> • <br /> Receipt # � Date Paid __ <br /> x Cost of Work Order $6275.00 Work Order# <br /> Cost of Service Order Service Order# <br /> ContactPerson Donnie Belk Teleplione# <br /> Requested By Go�don WltChe� Date of Request 8-29-14 _ <br /> Property Owner(name) Panattoni Development Cotnpany, InC <br /> Chuge Cost to(namc ff different tlian owner) <br /> Address 6840 Fort Denny Way, Ste 350 City Seattle Zip 98188 <br /> InstallaHon Localion 6301 36�h Ave West <br /> Inswllation type/description/size/etc. 12" on 12" tap lay pipe ou4 of road and connection. __ <br /> Contractor to excavate, shore, restore and provide traffic control and pour thrust block behind <br /> tapping sleeve. _ <br /> ❑ The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please noHEv the Citv of Everett Utilities Division 10 workinQ days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the esHmated cost is not sufficient to cover the total expense for labor,material,equipment renta] and <br /> administrarive costs, the deficit shall be charged to the property for which such installaHon was made and the <br /> owner thereof, and provided further, that any extess payment sha11 be retumed to the person appl}�ng for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> WATER ME"TEPS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK I.EfiD TIME. <br /> Material $4675.00 cc: Bldg.Permit Center\ � <br /> Mark Sadler <br /> Labor and Benefits 1017.00 Gordon Witcher <br /> Matt Welborn <br /> Equipment Rental _ 475.00 Mike Ward <br /> Tax 108.00 Randy Allen <br /> Paul Mr,Kee <br /> Restoration - <br /> TOTAL � $6275.00 <br /> Prepared by: __ Mike Ward ��jJ�,/�Date Estimate Prepared 9-9-14 <br /> Accepted by: _ Representing <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:WCommon\dcrical\Cost.esd2014\6301 36'"Ave W(2) , <br /> lofl <br />
The URL can be used to link to this page
Your browser does not support the video tag.