Laserfiche WebLink
Rj-3 <br />a 4 <br />9Hfn <br />HIS <br />rC O <br />w <br />HQ <br />7G to H <br />[�7 O <br />�3 l7 <br />OH <br />�V n <br />$H!H <br />rJ <br />HH <br />�ca <br />O t7 CC03 <br />�3 COD <br />HOCo <br />CONSTRUCTION COST ESTIMATE <br />BOEING RECREATIONAL CENTER <br />WETLANDS SYSTEM <br />CSI ID ITEM <br />UNIT <br />UNIT COST <br />QUANTITY <br />EXTENSION <br />021 SITE PREP <br />MOBILIZATION <br />LUMP <br />$4,01JD <br />CLEARIG-RUB <br />ACRE <br />S4,OOo.00 <br />1 <br />S4,000 <br />022 EARTHWORK <br />TRANSPORT <br />PEAT <br />CY <br />$10.00 <br />1800 <br />S18,000 <br />BERM FILL <br />CY <br />$10.00 <br />2600 <br />$26,000 <br />LINER <br />CY <br />570.00 <br />1000 <br />$19,000 <br />RIP RAP <br />CY <br />$10.00 <br />250 <br />52.500 <br />PLACEMEJT <br />PEAT <br />CY <br />S250 <br />1600 <br />S4,500 <br />BERM FILL <br />CY <br />S251) <br />2600 <br />S5,500 <br />LINER <br />t,' <br />$2.50 <br />1000 <br />S2,500 <br />RIP RAP <br />CY <br />S23.00 <br />250 <br />$5,750 <br />COMPACTION <br />BERM FILL <br />CY <br />S2.50 <br />2600 <br />$6,5x <br />LINER <br />CY <br />S250 <br />1000 <br />$4500 <br />EROSION CONTROL <br />TEMP. MESH <br />SQ.YD. <br />$1.00 <br />2000 <br />52,000 <br />HYDROSEEDING <br />SQ.FT. <br />S0.06 <br />20000 <br />S1,200 <br />SILTFENCE <br />(...FOOT <br />S3.00 <br />1000 <br />$3,000 <br />029 LANDSCAPING <br />TREE PLANTING <br />EACH <br />$100.00 <br />50 <br />$5,000 <br />SHRUB PLANTING <br />EACH <br />S50.00 <br />5D <br />S2,500 <br />SUBTOTAL <br />S106.450 <br />PROFIT <br />15% <br />$15,963 <br />TOTAL <br />SAY <br />S1,22,500 <br />BOND AMT. <br />I25°A <br />$153,022 <br />SAY <br />S75,000 <br />BOWET.XLS/JBF <br />