My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6400 36TH AVE W 2018-01-02 MF Import
>
Address Records
>
36TH AVE W
>
6400
>
6400 36TH AVE W 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2021 2:34:41 PM
Creation date
3/31/2017 8:26:47 AM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
6400
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R" <br />a H <br />H <br />rC H:z� <br />O � O <br />I�Hhtl <br />xx y H <br />m O <br />H O <br />A0 8 <br />H ] <br />H Ct <br />JUL-14-190 SPT 11:51 ID:W 0 H PRCIFIC TEL N0:259-7241 9060 P01 <br />FAX MEMORANDUM <br />Wilsey & Ham Pacific <br />FILE NO: <br />FAX TO: Gordon Witcher <br />COMPANY: City of Everett <br />FAX NO: 2594012 <br />NO, OF PAGES: 1 <br />FROM: Gene Wright <br />FAX NO: (206)259-7995 <br />PHO14B NO: (?A6)259-1572 <br />DATE: July 14, 1990 <br />RE: 36TH A17MOE W. <br />STREET AND SEWER DESIGN <br />We have received authorization from Boeing to design the wst half of 36th Avenue W. and a sewer <br />line to serve their proposed Employees Activity Center. <br />The eastern 2/; of the street has been constructed previously, and this construction will match that <br />existing cross-section. The comer of 36th/Seaway Boulevard will be rounded and curb, gutter and <br />si&-valk provided around the comer on the west side. <br />The sewer line will be an 8" diameter line and will connect to the existing 12" line which crosses 36th <br />at the intermee entrance. The line will be constructed within the new section of 36th far enough <br />south to serve the Activity Center. <br />We are on a very short schedule to complete the drawings. We expect to have construction drawings <br />completed by Friday, July 14, 1990. We will submit than to you as quickly as possible after they are <br />el i Pe <br />Please review the above general criteria and let us know if you have any concerns with our approach. <br />I will have Jim Malone of our Bellevue office contact you this week to coordinate the design. I will <br />0 be out of town for a few days this week, so if you have questions call Jim at 454-3250. <br />cc; Brian Ritchhart <br />Jim Malone <br />
The URL can be used to link to this page
Your browser does not support the video tag.