Laserfiche WebLink
L <br />- fit' <br />l <br />CLOSED CM WORK ORDERS <br />REPORT <br />Q <br />UTILITIES Total Utility Maintenance <br />Management <br />System <br />05/22/1992 <br />Pagu 1 <br />b <br />Date Range :11/09/1900 - 05/22/1992 <br />- 7401196770026Pattern <br />:5201196760004 <br />CM Work Order Range :1001085420229 <br />o <br />0 <br />Item Range :<Blank> - WVL3195Q19 Pattern <br />:* <br />m H <br />H <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 5201196760004 Title: REPAIR <br />2732 36TH <br />ST <br />°� <br />o <br />Item ID: WM2995QO02 -- WATER METER <br />Location ID: <br />N <br />Program 520 Function 119 <br />Activity <br />676 <br />y <br />Date Completed: 05/22/1992 <br />M <br />O N <br />H <br />o <br />y <br />Overall Craft: <br />Issued: 04/21/1992 Issued by: RJW <br />Assigned <br />to: <br />r <br />td <br />Out of Service? NO Priority: Travel <br />Time: 0.00 <br />Hr. <br />H 0 <br />N <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name Planned Hours <br />Actual Hours <br />------------ <br />Cost <br />--------- <br />----- ------------------------------------------------- <br />WSW LDS LOFLING, DELMAR S. <br />0.00 <br />5.00 <br />89.05 <br />WSW MKC MOORE, KIM C. <br />0.00 <br />5.00 <br />87.65 <br />materials: <br />Number <br />ID Description <br />Date <br />Used <br />Cost <br />y�e <br />------------------------------------------ <br />COUP38007847 COUPLING PJ 211 MIP X IPS PJ @ <br />-------- <br />04/27/1992 <br />---------------- <br />2 <br />40.66 <br />ELL038107947 ELL 2" STREET BRASS - <br />04/27/1992 <br />2 <br />35.60 <br />INSE38021047 INSERT STIFFENERS 2" CTS STLS@ <br />04/27/1992 <br />1 <br />0.72 <br />METE36089447 METER 5/8" TRIDENT <br />04/27/1992 <br />1 <br />25.15 <br />left <br />PIPE38060947 PIPE 2" POLY C.T.S. <br />04/27/1992 <br />5 <br />5.95 <br />SETT34033647 SETTER COP 5/8" X 3/4" LGTH15" <br />04/27/1992 <br />1 <br />45.12 <br />Vehicles: <br />_ <br />ID---------- Description <br />Hours ----- <br />Cost <br />V2117 CHEV 1 TON 191 <br />--Date <br />-- <br />04/27/1992 <br />5.00 <br />23.95 <br />V3505 BACKHOE CASE 82 <br />04/27/1992 <br />5.00 <br />62.65 <br />Al, <br />Work Description: <br />----------------------------------- <br />RAISED 2 INCH METER TO PROPER GRADE <br />-------------- <br />Total cost for work order 5201196760004: 416.70 <br />