Laserfiche WebLink
CLOSED CPI WORK ORDERS REPORT <br />Total Utility Maintenance Management System page 1 <br />12/24/1996 <br />Date Range :01/09/1989 - 12/12/1996 <br />CM Work Order Range :1001091070001 - UT2600-02- Pattern :*101196750912 <br />Item Range :<Blank> - WW22020001 <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101196750912 Title: CONVERT 2732 36TH S <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: -- <br />Location ID: - Activity 675 <br />Program 710 Function 119 y <br />Date Completed: 12/09/1996 <br />Overall Craft: Assigned to: <br />Issued: 12/06/1996 Issued by: WMW g <br />Out of Service? NO Pricrity: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL CSG <br />WST WDT <br />Materials: <br />ID <br />ADAP360012,:7 <br />BOX000043347 <br />BOXO00045147 <br />BOXO00065547 <br />COUP38007347 <br />ELL036102947 <br />INSE38021047 <br />METE36089247 <br />METE38137747 <br />NIPP38133947 <br />PIPE38060947 <br />SADD46018647 <br />SETT38033447 <br />VALV36008748 <br />VALV38034348 <br />Name <br />------------------------- <br />CAVANAH, SHANE G. <br />WALDEN, DAROLD T. <br />Vehicles: <br />ID <br />------------ <br />V2117 <br />VH0003 <br />Description <br />Planned Hrs Actual Hrs Cost <br />---------- ---- ----- <br />0.00 <br />52.28 <br />0.00 4.00 81.80 <br />Total Labor Cost: 134.08 <br />ADAPTER 1" MIP X INSTA-TITE @ <br />BOX VALVE 18"TOP 24"BOTTOM CI <br />BOX METER CONC W/STEEL LID <br />BOX METER CONC W/STEEL LID <br />COUPLING COMP 2" MIP X CTS @ <br />ELL 1" 90 DEG BRASS <br />INSERT STIFFENERS 2" CTS @ <br />METER 1" NEPTUNE T-10 <br />METER 2" NEPTUNE W/PRO READ ^ <br />NIPPLE 2" X 2 1/2" BRASS <br />PIPE 2" POLY C.T.S. <br />SERVICE SADDLE 8" W/2" IP DBL <br />SETTER CUST 2" LENGTH 1211X 17" <br />VALVE METER i" LOCK WING FIP @ <br />VALVE GATE 2" SUPER HEAVY DUTY <br />Description <br />------------------------------ <br />91 CHEV 1-TON HYD UNIT <br />94 CAT BACKHOE <br />Date <br /># Used <br />Cost <br />--- <br />12/09/1996 <br />-------- <br />2 <br />21.80 <br />12/05/1996 <br />1 <br />27.12 <br />12/05/1996 <br />1 <br />133.85 <br />12/09/1996 <br />1 <br />37.70 <br />12/05/1996 <br />2 <br />35.22 <br />12/09/1996 <br />1 <br />2.30 <br />12/05/1996 <br />2 <br />1.96 <br />12/09/1996 <br />1 <br />82.79 <br />12/05/1996 <br />1 <br />429.32 <br />12/05/1996 <br />1 <br />4.41 <br />12/05/1996 <br />9 <br />8.37 <br />12/05/1996 <br />1 <br />23.77 <br />12/05/1996 <br />1 <br />270.55 <br />12/09/1996 <br />1 <br />6.83 <br />12/05/1996 <br />1 <br />91.46 <br />Total Material Cost: 1179.45 <br />Hours Cost <br />---------------- <br />4.00 22.40 <br />4.00 111.60 <br />