My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/08/27 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/08/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 9:18:35 AM
Creation date
3/31/2017 9:16:34 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/27/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: 13 <br /> Consent COUNCIL BILL # <br /> Wiggums Hollow Skate Park X Action Originating Department Parks <br /> Change Order #2 First Reading Contact Person John Petersen <br /> Second Reading Phone Number Ext. 8371 <br /> Third Reading FOR AGENDA OF August 27, 2008 <br /> Public Hearing <br /> Initialed by: pg,Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Wiggums Hollow Park Budget Committee, 08-13-08 Change Order #2, Parks, Admin, Legal <br /> 2808 10th Street <br /> Amount Budgeted $578,803 Account Number: Fund 354, Program 023 <br /> $16,197 Donation from Greater Everett Community <br /> Foundation <br /> Expenditure Required $43,455 (plus WSST) <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> Change Order#2, at a cost of$43,455 (plus WSST) is the planned second change order which <br /> also reconciles final costs. It includes the following: 1) traffic signs and a storm water separator as <br /> required by project plan review; 2) surveillance system hardware (digital video recorder and <br /> router); 3) removal of 480 yards of unsuitable soil from the construction site; 4) minor <br /> miscellaneous items such as relocation of ADA railing to eliminate opportunities to enter the park <br /> by climbing the perimeter fence and additional grading and topsoil to create a berm on the north <br /> side of the park; and 5) a deductive change proposal to eliminate the planting of fir trees. <br /> Change Order#2 brings the total construction cost to $564,451.76 including Washington State <br /> sales tax and is within the project's remaining contingency. <br /> RECOMMENDATION (Exact action requested of Council): Authorize the Mayor to sign Change <br /> Order#2 for $43,455 (plus WSST) with Clements Bros., Inc. for the Wiggums Hollow Skate Park. <br /> 76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.