Laserfiche WebLink
Application For <br />OL PUBLIC WORKS PERMIT Date 7 ZZ ) g <br />PUBLIC WORKS DEPARTMENT Public Works Permit p <br />3200 Cedar Street <br />Everett, WA 98201 259-8810 q <br />SEP : 0 200� Building Permit If <br />TYPE OR PRINT ONLY TO /APOSTING Public Works Fee $ <br />/ <br />Owner mailingAddress <br />City Zip Phone <br />S'4 <br />Describe Proposed Work <br />PROJECT ADDRESS (if known) /3/8 - 3 7e <br />Attach four (4) copies of plans for proposed work - Drew to scale and note the following if applicable: <br />•Prcperty Lines 'Outline and dimensions at all existing and proposed structures on the lot "Existing and proposed utilities <br />Z. <br />"Centerline of street "Indicate North "Show any proposed grading changes "Show measurements -- <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance - phone 259-8810. <br />2. All work shall be performed in accordance with this permit and current City]bf: Everett Design and <br />Construction Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-8DO-424-5555. <br />4pP.v � _5c74 <br />! _70r^- � L drt-1wS <br />PLAN CI( 37ci.60 <br />TOTAL 24839.60 <br />CHE <br />A OM7393 <br />LU <br />i <br />A <br />ca <br />Z <br />0 <br />CO <br />am <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harmless <br />the City of Everett from any and all claims for damages, costs, expenses, or <br />causes of action that may arise because of Installation and maintenance of <br />the Improvement or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace public property <br />damaged there <br />!'ram. z✓ % 30 -y,� <br />Si ature pplicant Date <br />WORK AUTHORIZED BY THIS F ERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br />COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />