My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1318 37TH ST 2018-01-02 MF Import
>
Address Records
>
37TH ST
>
1318
>
1318 37TH ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2021 11:06:08 AM
Creation date
3/31/2017 9:47:55 AM
Metadata
Fields
Template:
Address Document
Street Name
37TH ST
Street Number
1318
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
797
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ESTIMATE SHEET <br />Receipt # <br />Cost of Work Order <br />X Cost of Service Order 8,669.00 <br />Contact Person Les Wear <br />Requested By Gordon Witcher <br />Property Owner (name) Our Land Inc. <br />Charge Cost to (name if different than owner) <br />Public Works Department <br />Utilities Division, 3200 Cedar Street <br />Everett, Washington 98201 <br />(425)257-8800 <br />Date Paid %.30' 96 <br />Work Order # <br />Service Order # -3 <br />Teler%tone # 308-0239 <br />Date of Request 7-21-98 <br />Address _ 620 SE Evt Mall Way City Everett Zip 98208 <br />Installation Location 37th & Norton <br />Ins:illation type/description/size/etc. 93. DCDA installation. Tap contractor installed 8" main. Install <br />gate valve box, 20" (+) 6" pipe vault DCDA. <br />❑ The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />❑ The following estimate is based upon the Street Division work group providing all labor, equipment, materials <br />and restoration to property. <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation date <br />to allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the prope.-ty for which Bach installation was made and the owner <br />thereof, and provided further, that any excess payment shall be returned to the person applying for the installation. <br />*Deposit must be paid prior to ordering parts or scheduling work. <br />Labor & Benefits 2,700.00 <br />Material 4,959.00 <br />Equipment Rental 1,010.00 <br />Surface Restoration <br />TOTAL *$8,669.00 <br />Prepared by: Gerr m Date Est. <br />Accepted by: Prepared: <br />7-22-98 <br />cc: Bldg. Permit Center <br />Clair Olivers <br />Tom Thetford <br />Kirk Brooks <br />Gordon Witcher <br />Dan Lowell <br />Stan Mitchell <br />Paul McKee <br />Gerry Crum <br />Alan Locke <br />Representing: <br />COSTAGNMWEAanturroznvn <br />7/L <br />
The URL can be used to link to this page
Your browser does not support the video tag.